Revision of Special (Gas Turbine Schemes) Allowance to the employees/ officers working in Gas Turbine Power Stations Orders

TAMIL NADU GENERATION AND DISTRIBUTION
CORPORATION LIMITED
(ABSTRACT)

Allowance – Gas Turbine Schemes – Revision of Special (Gas Turbine Schemes) Allowance to the employees/ officers working in Thirumakottai,  Kuttalam and  Valuthur Gas Turbine Power Stations -  Orders –Issued.

------------------------------------------------------------------------------------------
(SECRETARIAT BRANCH)

(Per) FB TANGEDCO Proceedings No.22,            Dated : 25-7-2015.                                                                                                                                                           
                                                                     Aadi -9,
              Thiruvalluvar Aandu 2046.

                                           Read:-

                          1) (Per) B.P. (Ch) No.112, (SB) dt. 10.5.2007.
                          2) (Per) B.P. (Ch) No.108, (SB) dt. 20.6.2008.
                          3) (Per) B.P. (Ch) No.223 (SB) dt.21-11-2009.
                          4) (Per) B.P. (Ch) No.224 (SB) dt.21-11-2009.       
                          5) Minutes of the 57th Board Meeting of TANGEDCO
                              held on 17.7.2015.
------

Proceedings:-


          In the Board’s Proceedings first cited, orders have been issued for payment of Special (Gas Turbine Schemes) Allowance at flat rate basis to the employees/officers of Thirumakkottai (K) Gas Turbine Power Station.

         2)  Subsequently, in the Board’s Proceedings second cited, orders have been issued for payment of Special (Gas Turbine Schemes) Allowance at flat rate basis to the employees/officers of Valuthur Gas Turbine Power Station and Kuttalam Gas Turbine Power Station .

         3) The Chief Engineer/Gas Turbine Schemes/Chennai had sent a proposal for revision of  Special (Gas Turbine Schemes) Allowance to the employees/officers of the Valuthur Gas Turbine Power Station, Kuttalam Gas Turbine Power Station and Thirumakkottai (K) Gas Turbine Power Station, stating that the above stations are located in remote places, where there is no residential quarters and thereby much difficulties are caused to the Operation and Maintenance Personnel to reach the station, in case of emergency during night hours due to lack of transport facilities.  The proposal was examined in detail.
.. 2 ..
:: 2 ::

          4)  At the time of Revision of wages ordered with effect from             1-12-2007, the Revision of Allowances/Special Pay was given effect to from 1-9-2009 to the employees / Officers as in the reference third and  fourth  cited, the  Special Gas Allowance has not been revised since it was newly implemented to the Gas Stations during 2007-08 only.  

         5)  After careful consideration, the TANGEDCO hereby orders that the  existing Special   (Gas Turbine Schemes) Allowance be doubled at the flat rate as in the Annexure to the employees/ officers of the  Valuthur Gas Turbine Power Station, Kuttalam Gas Turbine Power Station and Thirumakkottai (K) Gas Turbine Power Station .

          6)  The payment of Special (Gas Turbine Schemes) Allowance ordered in para-5 above shall take effect from the date of issue of              this order.

         7)  The expenditure sanctioned in para-3 above is debitable to “Tamil Nadu Electricity Board Funds” – Revenue Expenses – 75.410  Employees cost – Other Allowance - Special (Gas Turbine Schemes) Allowance.

8) The receipt of the Board’s Proceedings shall be acknowledged.

(BY ORDER OF THE BOARD)

                                                          R. KRISHNAN
SECRETARY (ADDL. CHARGE).

To
The  Chief Engineer/Gas Turbine Schemes.
The Chief Engineer/Personnel/Administrative Branch/Chennai-2.
The Chief Financial Controller/General & Revenue/Chennai.
The Superintending Engineer/Thirumakkottai (K) Gas Turbine Power Station.
The Superintending Engineer /Valuthur Gas Turbine Power Station .
The Superintending Engineer /Kuttalam Gas Turbine Power Station  .
The Superintending Engineer /Gas Turbine Power Station  /Chennai.
The Chief Internal Audit Officer/Audit Branch/Chennai -2.
The Residential Audit Officer /Chennai -2.
Copy to:-
The Chairman cum Managing Director's Table.
The Director General of Police/Vigilance.
The Managing Director/TANTRANSCO.
All Directors/TANGEDCO and TANTRANSCO.
The Secretary / TANGEDCO / Chennai-2.
.. 3 ..
:: 3 ::

The Legal Adviser.
The Executive Assistant to Chairman cum Managing Director’s office.
The Industrial Relations Adviser/TANGEDCO.
The Deputy Chief Engineer/Administrative Branch.
All Senior Personnel Officers/Administrative Branch.
The Industrial Relations Officer/TANGEDCO.
The Assistant Personnel Officer/Tamil Development – for Publication
                                                      in the TNEB Bulletin (2 copies).
All Branches.
Tamil Nadu Electricity Workers' Federation.
Tamil Nadu Electricity Board Accounts & Executive  Staff Union.
Tamil Nadu Electricity Board Workers Progressive Union (LPF).
Central Organisation of Tamil Nadu Electricity Employees (COTEE).
Minsara Pirivu Anna Thozhir Sangam.
Tamil Nadu Minvariya Janatha Thozhilalar Sangam.
Tamil Nadu National Electricity Workers' Federation (2 Groups).
Tamil Nadu Electricity Board Engineers' Sangam.
Tamil Nadu Electricity Employees Congress.
Tamil Nadu Electricity Board Thozhilalar Aykkiya Sangam.
Tamil Nadu Electricity Board Engineers' Association.
Tamil Nadu Electricity Board Finance & Accounts Officers Association.
Bharathiya Electricity Employees Federation.
Tamil Nadu Electricity Board Card Billing Staff Union.
Tamil Nadu Electricity Board Dr.Ambedkar Employees Union.
Tamil Nadu Electricity Board Engineers Union .



:: TRUE COPY :: FORWARDED :: BY ORDER ::



SECTION OFFICER.

p.t.o. for Annexure.







ANNEXURE
SPECIAL (GAS TURBINE SCHEMES) ALLOWANCE



Existing
Pay Range


(Rs.)
Revised Pay Range
(Pay + GP)
(Proposed)
(Rs.)
Existing
Special (G.T.S.) Allowance

(Rs.)
Revised
Special  (G.T.S)
Allowance (Doubled)
(Rs.)


Upto 3,500

3,501-4,000

4,001-4,500

4,501-5,000

5,001-5,500

5,501-6,000

6,001-7,000

7,001-8,000

8,001-9,000

9,001-10,000

10,001-11,000

11,001-12,000

12,001-13,000

13,001 and above


Upto 7649


7650-9399


9400-10699

10700-11999

12000-13299

13300-14599

14600-15899


15900-17399

17400-19199

19200-21699

21700-25599

25600-29799

29800 -34000

34000 and above

320

370

420

470

520

580

640

740

840

940

1,040

1,150

1,260

1,370


640

740

840

940

1,040

1,160

1,280

1,480

1,680

1,880

2080

2300

2520

2740






NOTE:  In cases where the revised rate of Allowance falls short of double the rate in the existing


 quantum of Allowance due to revised Pay Ranges, in such cases the quantum of Allowance


 shall be actually doubled.






// TRUE COPY //

                                                                  SECTION OFFICER.

No comments:

மின்சாரம் நுகர்வோர் கையேடு

 மின்சாரம் நுகர்வோர் கையேடு   Click