PROPOSED RWE STAFF STRENGTH IN THE GENERAL CONSTRUCTION CIRCLES

Draft Memorandum of Settlement under Sec 18(1) of the Industrial Disputes Act, 1947 reached between the  TANGEDCO and its Workmen.

Parties to the settlement            : TANGEDCO & ITS WORKMEN

Names of the Representatives   :

REPRESENTING EMPLOYER        :  1. Thiru. G. Rajagopal,
                                                           Director/Finance (TANGEDCO).  

       2. Thiru. S. Akshayakumar, 
                                                           Managing Director (TANTRANSCO) (A/c).
                                               
                                                      3.  Thiru.  D. Jeyaseelan,
                                                           Director (Distribution)      .

                                                      4.  Thiru.   Sankar,
                                                           Director (Generation).

                                                      5.  Thiru. S. Chinnarajalu,
                                                           Secretary.     

                                                      6. Thiru.  K. Muthu,    
                                                          Chief Engineer/Personnel (a/c).  

                                                      7. Thiru. S. Arulsamy,
                                                          Chief Financial Controller/General/
                                                          TANGEDCO 

REPRESENTING WORKMEN :

I. Tamil Nadu Electricity Worker’s Federation:

                                         1.  Thiru C.Veeraragavan, President.

2.     Thiru V.Ramachandran, General Secretary.


 II.  Tamil Nadu Electricity Board Workers Progressive Union:

                                         1. Thiru G. Ganapathy, President.

                                         2. Thiru S.Rathinsabapathy, General Secretary.
                                         


 III.  Central Organisation of Tamil Nadu  Electricity Employees

                                          1. Thiru K.Vijayan, President.

                                          2. Thiru S.S.Subramanian, General Secretary.
                                          
  IV.  Minsara Pirivu Anna Thozhir Sangam:       

                                          1.    Thiru. B. Sampathkumar, State President

2.          Thiru T.Vijayarangan, State Secretary.



V. Tamil Nadu Minvariya Janatha Thozhilalar 
      Sangam:        

                                      1. Thiru K. Selvaraj, General Secretary.

2.     Thiru M. Santha Gunalan, Organising Secretary.


VI.  Tamil Nadu National Electricity Worker’s Federation (Xavier Group):      

                                          1. Thiru. T.V.Xavier, General Secretary.

                                          2. Thiru. S. Ambinathan, Treasurer.
                                           
VIITamil Nadu Electricity Worker’s Federation  ( Swarnaraj Group)

                                            1.  Thiru R.Swarnaraj, General Secretary.

2.     Thiru. C. Kaliya Perumal, State Secretary.

VIII.  Tamil Nadu Electricity  Board Engineer’s  Sangam:

                                          1.   Thiru A. Antonypadovaraj,  President.

                                          2. Thiru V.Ashok Kumar, General Secretary.

                                          
IX.  Tamil Nadu  Electricity Employees Congress (NLO):                                   

                                         1.  Thiru S. Solomon, General Secretary.

                                         2. Thiru. M. Hariram, Joint General Secretary.

                                         

X.  Tamil Nadu Electricity Board Thozhilalar  Aykkiya  Sangam:
                            
1.        Thiru M.Subramanian, President.

2.        Thiru R.Manoharan, General Secretary.



XI. Bharathiya Electricity Employees  Federation:     

                                      1.   Thiru V.Marimuthu, President.

                                      2.  Thiru Chandran, General Secretary.

                                               
XII.  Tamil Nadu Electricity Board Card Billing  Staff  Union:

                                      1. Thiru M. Alphonse, President.

                                     2. Thiru D.Rathinavel, General Secretary.

                                     
XIII.  Tamil Nadu Electricity Board Dr. Ambedkar 
                                                 Employees Union:       

                                      1.  Thiru K.R.M.Adhi Dravidar, President.

                                      2. Thiru K.G.Samy, General Secretary.
XIV.  Tamil Nadu Electricity Board Engineers Union:  
                                                 
1.     Thiru. S.Manoharan, President.

2.     Thiru. R.Govindharajan, General Secretary.




Number and broad description of the  ]
                                                      ] 
Workmen Covered by the Settlement  ]

Total number of Regular Work Establishment employees covered is  1207. [Employees working in all General Construction Circles Thermal Power Stations (General Construction Circle, Chennai I & II, GCC/Trichy, GCC/Madurai, GCC/Salem and GCC/ Coimbatore)].

SHORT RECITAL OF THE CASE


          As per the Tamil Nadu Electricity (Re-organisation & Reforms) Transfer Scheme 2010, in G.O. (Ms) No. 100, Energy (B2) Department,   dated 19-10-2010, a company namely Tamil Nadu Generation and Distribution Corporation Limited (TANGEDCO) is constituted from the erstwhile Tamil Nadu Electricity Board.
        Whereas the employees of TANGEDCO have been demanding promotional avenues to the Regular Work Establishment employees in all the General Construction Circles.
          And whereas TANGEDCO constituted a Committee under the head of  Chief Engineer /Transmission/Chennai with the following Members namely the  Chief Engineer/ Distribution/Tirunelveli Region and Superintending Engineer /General Construction Circle -I/Chennai.
          And whereas, the Committee conducted the meetings among the members taking into account the existing staff pattern Division-wise, category-wise and analyse the requirement of staff strength and pattern by detailed study in all the General Construction Circles.  After a detailed study, the Committee submitted its report.
          And whereas, the recommendations of the General Construction Circle  Committee was referred to the Wage Revision Committee headed by the Director/Finance/TANGEDCO.   The Wage Revision Committee has analysed the report submitted by the General Construction Circle  Committee headed by the Chief Engineer /Transmission/Chennai in detail and also the financial commitment involved in the implementation of the recommendations of the General Construction Circle Committee.
             And whereas the Wage Revision Committee has examined the Regular Work Establishment staff strength in all the General Construction Circles and the General Construction Circle’s report in this regard and has made certain recommendations.  The recommendation of the Wage Revision Committee was given to the unions by issuing 9-A notice for inviting their views.   Most of the Unions have furnished their  replies. 
                   The Management and the Trade Unions had direct negotiation regarding the above issues.  A Notice under 9-A Notice of the Industrial Dispute Act  was issued to the Unions and remarks were received from the Unions.    
          Whereas the parties with a view to continue the cordial relationship existing between them, want to have an amicable Settlement.
          And in pursuance of the above decision arrived at between the parties, a Settlement is reached on the following terms:-
TERMS OF SETTLEMENT
        i.            It is agreed that the existing staff strength in all the General Construction Circles will be revised  as in Annexure –I of this Settlement. 
      ii.            It is agreed for Creation of 318 posts and abolition of 457 posts in various  categories in all the General Construction Circles.  The details of creation and abolition of posts are in Annexure-II & Annexure III.
    iii.            It is agreed that the Lineman equivalent posts in Regular Work Establishment category (except Drivers) in General Construction Circles will be abolished and Line Inspector equivalent posts will be created on par with the Distribution Circles and Thermal Power Stations.
    iv.            It is agreed that the Line Inspector equivalent posts in General Construction Circle will be commonly termed as “FOREMAN Gr.II” and Wireman equivalent posts will be commonly termed as “FITTER”.
      v.            It is agreed  that the relaxation of educational qualification for the existing employees covered under this Settlement will be considered for future promotions. This relaxation will not be applicable for the future recruits.
         It is agreed by both parties to approach the Commissioner of Labour for converting this 18(1) Settlement to a Settlement under Section 12(3) of the Industrial Disputes Act, later.
         Agreed to the above terms.

 
      Signature of                                                       Signature of
TANGEDCO’s Representatives                             Workmen Representatives





Copy to:
1.The Secretary to Government, Labour and Employment Department, Ch-9.
2. The Commissioner of Labour, Chennai-6.
3. The Assistant Commissioner of Labour (Conciliation), Chennai.
4. The Labour Officers, Thoothukudi and Salem.      



ABOLITION OF POSTS IN GENERAL CONSTRUCTION CIRCLES (RWE) ANNEXURE - III
Sl. Name of the post Grade Pay  GCC-I& II/ GCC/ GCC/ GCC/ GCC/ TOTAL
No. Rs. CHENNAI TRICHY MADURAI SALEM CBE
1 Special Grade Foreman 4600/-  0 0 0 0 0 0
2 Foreman Gr.I 4,300/- 0 0 0 0 0 0
3 Line Inspector (equivalent) 2,700/- 0 0 0 0 0 0
4 Lineman (equivalent) 2,500/- 38 43 35 12 42 170
5 Wireman (equivalent) 2,200/- 24 10 0 0 8 42
6 Helper 1,900/- 53 0 0 0 46 99
7 Mazdoor 1,400/- 36 38 42 0 0 116
TOTAL 151 91 77 12 96 427
ABOLITION OF POSTS IN GENERAL CONSTRUCTION CIRCLES (DRIVERS)
Sl. Name of the post Grade Pay  GCC-I& II/ GCC/ GCC/ GCC/ GCC/ TOTAL
No. Rs. CHENNAI TRICHY MADURAI SALEM CBE
1 Special Grade Foreman 4600/-  0 0 0 0 0 0
2 Foreman Gr.I 4,300/- 0 0 0 0 0 0 Abolition
RWE  427
3 Line Inspector (equivalent) 2,700/- 0 0 5 2 0 7 Driver 30
457
4 Lineman (equivalent) 2,500/- 4 8 7 2 2 23
5 Wireman (equivalent) 2,200/- 0 0 0 0 0 0
6 Helper 1,900/- 0 0 0 0 0 0
TOTAL 4 8 12 4 2 30
ANNEXURE - II
CREATION OF POSTS IN GENERAL CONSTRUCTION CIRCLES (RWE)
Sl. Name of the post Grade Pay  GCC-I& II/ GCC/ GCC/ GCC/ GCC/ TOTAL
No. Rs. CHENNAI TRICHY MADURAI SALEM CBE
1 Special Grade Foreman 4600/-  10 7 6 7 6 36
2 Foreman Gr.I 4,300/- 11 20 23 9 15 78
3 Line Inspector (equivalent) 2,700/- 9 14 0 0 22 45
4 Lineman (equivalent) 2,500/- 0 0 0 0 0 0
5 Wireman (equivalent) 2,200/- 0 0 6 6 0 12
6 Helper 1,900/- 0 19 54 14 0 87
7 Mazdoor 1,400/- 0 0 0 49 0 49
TOTAL 30 60 89 85 43 307
CREATION OF POSTS IN GENERAL CONSTRUCTION CIRCLES (DRIVERS)
Sl. Name of the post Grade Pay  GCC-I& II/ GCC/ GCC/ GCC/ GCC/ TOTAL
No. Rs. CHENNAI TRICHY MADURAI SALEM CBE
1 Special Grade Foreman 4600/-  0 0 0 0 0 0
Creation 
2 Foreman Gr.I 4,300/- 4 2 3 1 1 11 RWE  307
Driver 11
3 Line Inspector (equivalent) 2,700/- 0 0 0 0 0 0 318
4 Lineman (equivalent) 2,500/- 0 0 0 0 0 0
5 Wireman (equivalent) 2,200/- 0 0 0 0 0 0
6 Helper 1,900/- 0 0 0 0 0 0
TOTAL 4 2 3 1 1
11






             
ANNEXURE - I
PROPOSED RWE STAFF STRENGTH IN THE 
GENERAL CONSTRUCTION CIRCLES
             
Sl. Name of the post GCC - I & II / GCC / GCC / GCC /  GCC/
No.   CHENNAI TRICHY MADURAI SALEM COIMBATORE
1 Special Grade Foreman 13 9 8 8 8
  Spl.Gr.Foreman Driver 1 1 1 1 1
  Rs.10100-34800+4600 G.P.          
    14 10 9 9 9
2 Foreman Gr.I  34 31 35 21 25
  Foreman Driver 7 3 4 2 3
  Rs.9600-34800+ 4300 G.P.          
    41 34 39 23 28
3 Line Inspector equivalent categories 101 105 83 45 92
  Senior Gr. Driver 9 7 10 5 7
  Rs.5400-20200 + 2700 G.P.          
    110 112 93 50 99
4 LineMan equivalent Categories 0 0 0 0 0
  Driver 5 4 6 4 3
  Rs.5400-20200 + 2500 G.P.          
    5 4 6 4 3
5 Wireman equivalent Categories 35 48 39 12 25
  Rs.5400-20200 + 2200 G.P.          
             
6 Helper  (Field Assistant) 40 58 63 27 25
  Rs.5400-20200 + 1900 G.P.          
             
7 Mazdoor  6 22 24 70 23
  Rs.4900-10000 + 1400 G.P.          
    251 288 273 195 212
Total 1219

No comments: