TAMILNADU GENERATION AND DISTRIBUTION CORPORATION LIMITED
(SECRETARIAT BRANCH)
144, ANNA SALAI,
CHENNAI-600 002.
Memorandum
No. 36960/A1/A11/2014-2, dated 03.07.2014
Sub:
Establishment - TANGEDCO Class I Service
- Executive Engineers/
Electrical
– Transfers and postings - Orders - Issued.
******
The
following transfers and
postings of Executive Engineers/Electrical are ordered:
Sl.
No.
|
Name and Designation
THIRUVALARGAL
|
Posted on Transfer
|
In the place of
THIRUVALARGAL
|
(1)
|
(2)
|
(3)
|
(4)
|
1.
|
S.Ganesan
EE/O&M/Perambur/
Chennai
EDC/North
|
EE/230 KVSS/Atthippattu
Chennai EDC/North
|
Existing Vacancy
|
2.
|
M.Ashokan
EE/Operation//Singarapet/
Thiruppathur
EDC.
|
EE/Operation/
K.R.Thoppur/
Mettur EDC.
|
Existing Vacancy
|
3.
|
N.Gunasekaran
EE/Electrical,
O/o.SE/Designs/P&C/
Chennai
|
EE/P&C/Guindy/Chennai
|
(Newly created post in
(Per.) FB TANGEDCO Proceedings No. 30
(SB) dated 30.06.2014)
|
4.
|
G.Guruvammal
EE/O&M/Sivakasi
Virudhunagar
EDC.
|
EE/Electrical/400/230
KVSS/Kayathar/
Tirunelveli EDC.
|
(Newly created post in
(Per.) CMD TANGEDCO Proceedings No.
85 (SB) dated 02.06.2014)
|
2.
The Executive Engineers/Electrical mentioned in Sl.Nos., 2 and 4 in
para-1 above are not eligible for
Transfer Travelling Allowance.
..2..
..2..
3. The Chief
Engineers/Superintending Engineers concerned are directed to relieve the above
Officials, immediately.
4. A report
regarding the date of relief and
date of joining of the officials
should be sent to the Tamil Nadu Generation and Distribution Corporation
Limited. This will be apart from the Certificate of
Transfer of Charge.
(BY ORDER OF THE CHAIRMAN CUM MANAGING DIRECTOR)
S.CHINNARAJALU
SECRETARY
To
Thiru
S.Ganesan, Executive Engineer/O&M/Perambur
Through:-
The Superintending Engineer/Chennai EDC/North
|
Thiru
M.Ashokan, Executive Engineer/Operation/Singarapet
Through:-
The Superintending Engineer/Thiruppathur EDC.
|
Thiru
N.Gunasekaran, Executive Engineer/Electrical, O/o.SE/Designs/P&C/Chennai
Through:-
The Superintending Engineer/Designs/P&C/Chennai
|
Tmty.
G.Guruvammal, Executive Engineer/O&M/Sivakasi
Through:-
The Superintending Engineer/Virudhunagar EDC.
|
Copy to:
The
Director/Generation/TANGEDCO/Chennai
The Director (Distribution)/TANGEDCO/Chennai
The Director General of
Police/Vigilance/Chennai
The Legal
Adviser/TANGEDCO/Chennai,
The Managing
Director/TANTRANSCO/Chennai
The
Director/Projects/TANGEDCO/Chennai
The Director/Transmission
Projects/TANTRANSCO/Chennai
The Director/Operation/TANTRANSCO/Chennai,
The Chief
Engineers/TANGEDCO/TANTRANSCO
..3..
..3..
The
Director/Finance/TANGEDCO/Chennai.
The
Director/Finance/TANTRANSCO/Chennai.
The Chief Financial
Controller/General/TANGEDCO/Chennai
The Chief Financial
Controller/TANTRANSCO/Chennai.
The Chief Financial
Controller/Revenue/TANGEDCO/Chennai
The Chief Financial
Controller/Regulatory Cell/TANGEDCO/Chennai
The General Manager/Human
Resource Development/Chennai.
The Superintending
Engineer/Computer Centre/Chennai
The Superintending
Engineer/Chennai EDC/North
The Superintending
Engineer/Tiruppathur EDC
The Superintending
Engineer/Designs/P&C/Chennai
The Superintending
Engineer/Virudhunagar EDC
The Superintending
Engineer/Mettur EDC
The Superintending
Engineer/P&C/Chennai
The Superintending
Engineer/Tirunelveli EDC
The Chief Internal Audit
Officer.
The Deputy
Secretary/Personnel/Administration/TANTRANSCO,
The Chief Public
Relations Officer.
The Under
Secretary/Services/Secretariat Branch
The Under
Secretary/General/Secretariat Branch
The Executive Assistant
to Chairman cum Managing Director/TANGEDCO.
The Private Secretary to
Chairman Cum Managing Director/Secretary
Administrative Branch
Computer Centre
Vigilance Cell.
A2, A5, A13, A15, A20,
A22, A23 and A25 Sections/Secretariat Branch
//
TRUE COPY : : FORWARDED : : BY ORDER //
SECTION OFFICER
TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION
LIMITED
(SECRETARIAT BRANCH)
144,
ANNA SALAI
CHENNAI-600
002.
Memorandum No. 36960/A1/A11/2014-3, dated
03.07.2014
Sub: Establishment
- Class I Service - Executive
Engineer/Electrical –
Modification
and Posting - Orders - Issued.
Ref: (Per.) CMD
TANGEDCO Proceedings No.151 (SB) dated 27.05.2014.
*****
The
order issued in the proceedings cited, posting Tmty.G.K.Kanchana,
Assistant Executive Engineer/Electrical/P&C/Chennai, on promotion as Executive Engineer/MRT/Tuticorin/Tuticorin
Electricity Distribution Circle, is hereby cancelled.
2.
Tmty.G.K.Kanchana, Executive Engineer/Electrical (under
orders of promotion) is posted as Executive Engineer/Electrical, Office
of the Superintending Engineer/Designs/P&C/Chennai, vice Thiru N.Gunasekaran, Executive Engineer/ Electrical,
transferred.
3. The Superintending Engineer
concerned, is directed to relieve the above Official, immediately.
4. A report regarding the date of
relief and date of joining of the official
should be sent to the Tamil Nadu Generation and Distribution Corporation
Limited. This will be apart from the
Certificate of Transfer of Charge.
(BY ORDER OF THE CHAIRMAN CUM MANAGING DIRECTOR)
S.CHINNARAJALU
SECRETARY
To
Tmty.G.K.Kanchana, Executive Engineer/Electrical
Through:- The Superintending
Engineer/P&C/Chennai
Copy to:
The
Director/Generation/TANGEDCO/Chennai
The Director
(Distribution)/TANGEDCO/Chennai
The Director General of
Police/Vigilance/Chennai
The Legal
Adviser/TANGEDCO/Chennai,
The Managing
Director/TANTRANSCO/Chennai
..2..
..2..
..2..
The
Director/Projects/TANGEDCO/Chennai
The Director/Transmission
Projects/TANTRANSCO/Chennai
The
Director/Operation/TANTRANSCO/Chennai,
The Chief
Engineers/TANGEDCO/TANTRANSCO
The
Director/Finance/TANGEDCO/Chennai.
The
Director/Finance/TANTRANSCO/Chennai.
The Chief Financial
Controller/General/TANGEDCO/Chennai
The Chief Financial
Controller/TANTRANSCO/Chennai.
The Chief Financial
Controller/Revenue/TANGEDCO/Chennai
The Chief Financial
Controller/Regulatory Cell/TANGEDCO/Chennai
The General Manager/Human
Resource Development/Chennai.
The Superintending
Engineer/P&C/Chennai
The Superintending
Engineer/Tuticorin EDC
The Superintending
Engineer/Designs/P&C/Chennai
The Superintending
Engineer/Computer Centre/Chennai
The Chief Internal Audit
Officer.
The Deputy
Secretary/Personnel/Administration/TANTRANSCO,
The Chief Public
Relations Officer.
The Under
Secretary/Services/Secretariat Branch
The Under
Secretary/General/Secretariat Branch
The Executive Assistant
to Chairman cum Managing Director/TANGEDCO.
The Private Secretary to
Chairman Cum Managing Director/Secretary
Administrative Branch
Computer Centre
Vigilance Cell.
A2, A5, A15, A20, A22,
A23 and A25 Sections/Secretariat Branch
// TRUE COPY : : FORWARDED : : BY ORDER //
SECTION OFFICER
TAMILNADU GENERATION
AND DISTRIBUTION CORPORATION LIMITED
(ABSTRACT)
Establishment - TANGEDCO - Class
I Service - Executive Engineers/Electrical - Promotion and Postings - Orders -
Issued.
-----------------------------------------------------------------------------------------------------------
(SECRETARIAT BRANCH)
(Per.) CMD TANGEDCO
Proceedings No. 197
Dated the 3rd July,
2014
Aani 19, Srijaya
Thiruvalluvar
Aandu-2045.
READ:-
(Per.) CMD TANGEDCO Proceedings No.1, dated 02.01.2014
*******
PROCEEDINGS:-
Under
Regulation 92 of the Tamil
Nadu Electricity Board Service
Regulations, read with the Tamil Nadu Electricity (Re-organisation
and Reforms) Transfer Scheme 2010, the
following 14 (Fourteen only)
Assistant Executive
Engineers/Electrical are regularly
promoted and appointed
as Executive Engineers/Electrical in
Class-I, (Division-III, Category-3)
of Tamil Nadu Generation and
Distribution Corporation Limited Service with
effect from the date of
assumption of charge.
THIRUVALARGAL/TMTY:-
|
R.
|
KALPANA
|
|
V.
|
BALASUBRAMANIAN
|
|
P.
|
ARUNACHALAM
|
|
S.
|
KANNAN
|
|
J.E.
|
JOHN DALTON
|
|
V.
|
ARUTSELVAN
|
|
D.
|
ASHOK KUMAR
|
|
N.
|
SIDHI ABDUL KADER
|
|
P.
|
CHANDRASEKARAN
|
|
J.
|
PREMALATHA
|
|
M.
|
ILANGO
|
|
T.
|
BANU
|
13.
|
S.
|
GOVINDARAJ
|
14.
|
T.
|
VIMALA
|
..2..
..2..
2.
The following postings of Executive Engineers/Electrical, are ordered:-
Sl.
No.
|
Name and Designation
THIRUVALARGAL/TMTY
|
Posted on Promotion
|
In the place of
THIRUVALARGAL/TMTY
|
(1)
|
(2)
|
(3)
|
(4)
|
|
R.Kalpana
AEE/Electrical,
Trichy EDC/Metro
|
EE/MRT/Perambalur/
Perambalur EDC
|
Existing Vacancy
|
|
V.Balasubramanian
AEE/Electrical,
Chennai EDC/South
|
EE/SS/Erection/GCC-II/
Chennai
|
K.A.Ajitkumar, EE/Electrical,
Proceeded on Leave
|
|
P.Arunachalam
AEE/Electrical
Chennai EDC/West
|
EE/O&M/Perambur/
Chennai EDC/North
|
S.Ganesan, EE/Electrical,
transferred
|
|
S.Kannan
AEE/Electrical,
Pudukottai EDC
|
EE/Operation/Arani/
Tiruvannamalai EDC
|
Existing Vacancy
|
|
J.E.John Dalton,
AEE/Electrical/Tuticorin
Thermal Power Station
|
EE/Electrical/NCTPS (2x600 MW)
Stage-II
|
Existing Vacancy
|
|
V.Arutselvan
AEE/Electrical/
Vellore EDC
|
EE/Electrical,
O/o.CE/D/Vellore Region
|
Existing Vacancy
|
|
D.Ashok Kumar
AEE/Electrical/
Generation/Erode
|
EE/O&M/Chetpet/
Tiruvannamalai EDC
|
Existing Vacancy
|
|
N.Sidhi Abdul Kader,
AEE/Electrical/
Sivaganga EDC.
|
EE/O&M/Kallidaikurichi/
Tirunelveli EDC
|
Existing Vacancy
|
|
P.Chandrasekaran
AEE/Electrical/
Kayathar/P&C/Madurai
|
EE/P&C-II/Tirunelveli
|
(Newly created post in (Per.)
FB TANGEDCO Proceedings No. 30 (SB)
dated 30.06.2014)
|
..3..
..3..
Sl.
No.
|
Name and Designation
THIRUVALARGAL/TMTY
|
Posted on Promotion
|
In the place of
THIRUVALARGAL/TMTY
|
(1)
|
(2)
|
(3)
|
(4)
|
|
J.Premalatha, AEE/Electrical
SE/Madurai EDC/Metro
|
EE/General/Theni/
Theni EDC
|
S.E.S.Syed Ahmed,
EE/Electrical, proceeded on
Leave
|
|
M.Ilango, AEE/Electrical
SE/GCC/Madurai
|
EE/O&M/Sivakasi
Virudhunagar EDC
|
G.Guruvammal, EE/Electrical,
transferred
|
|
T.Banu, AEE/Electrical
SE/Coimbatore/North
|
EE/MRT/Tuticorin/
Tuticorin EDC
|
G.K.Kanchana, EE/Electrical,
whose orders has been modified.
|
|
S.Govindaraju,
AEE/Electrical
SE/Coimbatore EDC/ South
|
EE/O&M/Dharmapuri/
Dharmapuri EDC
|
Existing Vacancy
|
|
T.Vimala
AEE/Electrical
O/o.CE/D/Chennai Region/ North
|
EE/Electrical,
O/o.SE/Transmission-IV/ Chennai, (under the control of CE/ Transmission/
Chennai
|
(Newly created post in (Per.)
CMD TANGEDCO Proceedings No.185 (SB)
dated 24.06.2014)
|
3. The Chief Engineers/Superintending
Engineers concerned are directed to relieve
the officials under orders of promotion
and postings immediately by making local arrangements without waiting
for substitutes and instruct them to join at the new post before expiry
of joining time. A report should
be sent to the
Tamil Nadu Generation and Distribution Corporation Limited
regarding the date
of relief and
date of joining
of the officials. This will be apart from the Certificate
of Transfer of Charge.
4.
The Chief Engineers/Superintending Engineers
concerned are also directed to ensure that whether, any disciplinary
proceeding is pending/charges framed/ punishment awarded, if any, against the
official mentioned in para-1 above, before serving the promotion order. If so, necessary clarification may be
obtained from the Secretary before serving the said promotion order to the
official concerned.
..4..
..4..
5.
An option format is enclosed herewith.
The officials mentioned in
para-1 above are requested to
return the option format
duly filled in,
within one month from
the date of promotion and assumption of charge. If the option format is not received
within the said period of one month, their pay in the
higher post will be fixed as specified in para-3 of Board's Memo.
No.75406/P1/90-1, dated 19.3.1991.
(BY ORDER OF THE CHAIRMAN CUM
MANAGING DIRECTOR)
S.CHINNARAJALU
SECRETARY
To
Thiru R.Kalpana, Assistant Executive Engineer/Electrical,
Through:- The Superintending Engineer/Trichy EDC/Metro
|
Thiru V.Balasubramanian, Assistant Executive Engineer/Electrical,
Through:- The Superintending Engineer/Chennai EDC/South
|
Thiru P.Arunachalam, Assistant Executive Engineer/Electrical
Through:- The Superintending Engineer/Chennai EDC/West
|
Thiru S.Kannan, Assistant Executive Engineer/Electrical,
Through:- The Superintending Engineer/Pudukottai EDC
|
Thiru J.E.John Dalton, Assistant Executive Engineer/Electrical/
Through:- The Superintending Engineer/P&A/TTPS
|
Thiru V.Arutselvan, Assistant Executive Engineer/Electrical
Through:- The Superintending Engineer/Vellore EDC
|
Thiru D.Ashok Kumar, Assistant Executive Engineer/Electrical
Through:- The Superintending Engineer/Generation/Erode
|
Thiru N.Sidhi Abdul Kader, Assistant Executive Engineer/Electrical
Through:- The Superintending Engineer/Sivaganga EDC.
|
Thiru P.Chandrasekaran, Assistant Executive
Engineer/Electrical/Kayathar
Through:- The Superintending Engineer/P&C/Madurai
|
..5..
..5..
Tmty. J.Premalatha, Assistant Executive Engineer/Electrical
Through:- The Superintending Engineer/Madurai EDC/Metro
|
Thiru M.Ilango, Assistant Executive Engineer/Electrical
Through:- The Superintending Engineer/GCC/Madurai
|
Tmty. T.Banu, Assistant Executive Engineer/Electrical
Through:- The Superintending Engineer/Coimbatore/North
|
Thiru S.Govindaraju, Assistant Executive Engineer/Electrical
Through:- The Superintending Engineer/Coimbatore EDC/ South
|
Tmty. T.Vimala, Assistant Executive Engineer/Electrical
O/o.CE/D/Chennai
Region/ North
Through:- The Chief Engineer/Chennai Region/North
|
Copy to:
The
Director/Generation/TANGEDCO/Chennai
The Director (Distribution)/TANGEDCO/Chennai
The Director General of
Police/Vigilance/Chennai
The Legal
Adviser/TANGEDCO/Chennai,
The Managing
Director/TANTRANSCO/Chennai
The
Director/Projects/TANGEDCO/Chennai
The Director/Transmission
Projects/TANTRANSCO/Chennai
The Director/Operation/TANTRANSCO/Chennai,
The Chief
Engineers/TANGEDCO/TANTRANSCO
The
Director/Finance/TANGEDCO/Chennai.
The
Director/Finance/TANTRANSCO/Chennai.
The Chief Financial Controller/General/TANGEDCO/Chennai
The Chief Financial Controller/TANTRANSCO/Chennai.
The Chief Financial
Controller/Revenue/TANGEDCO/Chennai
The Chief Financial
Controller/Regulatory Cell/TANGEDCO/Chennai
The Superintending
Engineer/Trichy EDC/Metro
The Superintending
Engineer/Chennai EDC/South
The Superintending
Engineer/Chennai EDC/West
The Superintending
Engineer/Pudukkottai EDC
The Superintending
Engineer/P&A/TTPS
The Superintending
Engineer/Vellore EDC
The Superintending
Engineer/Generation/Erode
..6..
..6..
The Superintending
Engineer/Sivaganga EDC
The Superintending Engineer/P&C/Madurai
The Superintending
Engineer/Madurai EDC/Metro
The Superintending
Engineer/GCC/Madurai
The Superintending
Engineer/Coimbatore EDC/North
The Superintending
Engineer/Coimbatore EDC/South
The Superintending
Engineer/Perambur EDC
The Superintending
Engineer/GCC-II/Chennai
The Superintending
Engineer/Tiruvannamalai EDC
The Superintending
Engineer/P&A/NCTPS
The Superintending
Engineer/Tirunelveli EDC
The Superintending
Engineer/P&Chennai-II/Tirunelveli
The Superintending Engineer/Theni
EDC
The Superintending
Engineer/Virudhunagar EDC
The Superintending
Engineer/Tuticorin EDC
The Superintending
Engineer/Dharmapuri EDC
The Superintending
Engineer/Transmission-IV/Chennai
The General Manager/Human
Resource Development/Chennai.
The Superintending Engineer/Computer
Centre/Chennai
The Chief Internal Audit Officer.
The Deputy Secretary/Personnel/Administration/TANTRANSCO,
The Chief Public Relations
Officer.
The Under
Secretary/Services/Secretariat Branch
The Under
Secretary/General/Secretariat Branch
The Executive Assistant to
Chairman cum Managing Director/TANGEDCO.
The Private Secretary to Chairman
Cum Managing Director/Secretary
Administrative Branch
Computer Centre
Vigilance Cell.
A2, A5, A15, A20, A22, A23 and
A25 Sections/Secretariat Branch
//
TRUE COPY : : FORWARDED : : BY ORDER //
SECTION OFFICER
No comments: