COURT
CASE - IMMEDIATE :
:: TAMIL NADU
GENERATION & DISTRIBUTION
CORPORATION ::
(Administrative
Branch)
From
Er. S. Syed Liyakath B.E.,
Chief Engineer/Personnel,
144, Anna Salai,
Chennai- 600 002.
|
To
The Chief Engineers/
Distribution, Transmission and
Project (Erode).
|
Letter
No.121919/G.58/G.582/2009, dated 29.06.2012.
Sir,
Sub :
|
Court
case - W.P. No.22100/2009 filed by COTTEE before the Hon'ble High Court /
Madras for absorption of contract labourers - Handing over of records to be
verified - Reg.
|
Ref :
|
1) This office
Lr.No.121919/G.58/G.582/2009 dt.27.06.12
|
* ** ** *
|
In continuation to this
office letter cited under reference, I enclose herewith a format to be filled
columnwise after thorough verification of particulars of the individuals
covered in the W.P. 22100/2009 with the signature of the Superintending
Engineer so as to consolidate and place the report before the committee
constituted as per BP (Ch) 9 dt.09.01.08 and to appraise the position to the
Hon'ble High Court on the contempt petition filed by the union
It is also to be noted that
the particulars of every individual should be filled as per details in the
books furnished by the petitioner. Also
if any repetitions of the same individual is found it must be mentioned in the special
remarks.
Also, the Chief Engineers are
once again requested to submit their report immediately after verification on
or before 09.07.2012 in person. Since the Chairman cum Managing Director is
involved in this Contempt Petition, your personal attention is requested in
this regard.
Yours faithfully
(N. THIAGARAJAN))
SENIOR PERSONNEL OFFICER/ LABOUR
for CHIEF ENGINEER/ PERSONNEL
|
Encl. :
Copy to : All
the Superintending Engineers (Through E-mail)
No comments: