TAMILNADU GENERATION
AND DISTRIBUTION CORPORATION LIMITED
(ABSTRACT)
Establishment - TANGEDCO - Class
I Service - Executive Engineers/Electrical – Promotion and Postings - Orders -
Issued.
-------------------------------------------------------------------------------------------------------
(SECRETARIAT BRANCH)
(Per.) CMD TANGEDCO
Proceedings No.95 Dated the 30th May,
2016
Vaikasi 17,
Durmughi
Thiruvalluvar Aandu-2047.
READ:-
(Per.) CMD TANGEDCO Proceedings No.15 dated 22.01.2016
*****
PROCEEDINGS:-
Under
Regulation 92 of the Tamil
Nadu Electricity Board Service
Regulations, read with the Tamil Nadu Electricity (Re-organisation
and Reforms) Transfer Scheme 2010, the
following 25 (Twenty five only)
Assistant Executive
Engineers/Electrical are promoted and
appointed as Executive Engineers/Electrical in Class-I,
(Division-III, Category-3) of Tamil
Nadu Generation and Distribution Corporation Limited Service with effect
from the date of assumption
of charge:-
Sl.No
|
|
Name
THIRUVALARGAL/TMTY:-
|
Panel
Sl.No.
|
|
A.
|
BARATHI
|
64
|
|
R.
|
JAYANTHI
|
65
|
|
M.
|
BHUVANESHWARI
|
67
|
|
S.
|
JEYANTHI
|
68
|
|
C.
|
SANKAR
|
69
|
|
V.
|
UMAMAHESWARI
|
70
|
|
S.
|
VEENA
|
71
|
|
J.R.
|
SHANTHI
|
72
|
|
B.G.
|
SARASWATHY
|
73
|
|
V.S.
|
VENNILA
|
74
|
|
J.
|
ANGUSWAMY
|
75
|
|
K.M.
|
KOMAGAL
|
76
|
|
P.S.
|
UJJAYANTHI
|
77
|
|
V.
|
VIDHYA
|
78
|
|
K.
|
KANNAN
|
79
|
|
T.
|
SAMUEL SUNDARRAJ SARGUNAR
|
80
|
|
N.
|
JESU ANTONY SAHAYA NIXON
|
81
|
|
G.
|
HEMALATHA
|
82
|
|
S.
|
ALAMAR SELVAN
|
83
|
..2..
|
..2..
Sl.No
|
|
Name
THIRUVALARGAL/TMTY:-
|
Panel
Sl.No.
|
|
K.
|
RADHIKA
|
84
|
|
R.
|
DEIVAYANAI
|
85
|
|
K.
|
SADATHUNNISA
|
86
|
|
V.
|
GNANAMOORTHY
|
87
|
|
|
PATRICIA THANGARAJ
|
88
|
|
G.
|
SAVITHIRI
|
89
|
2. Consequent to the above promotions, the following
postings are ordered herewith, with immediate effect:-
Sl.
No.
|
Name and Designation
THIRUVALARGAL/TMTY
|
Place of Posting
|
In the place of
THIRUVALARGAL/TMTY
|
(1)
|
(2)
|
(3)
|
(4)
|
|
A.BARATHI,
AEE/Electrical/Planning
O/o.CE/Distribution/
Villupuram EDC
|
EE/General-cum-MRT/ Villupuram/
Villupuram EDC
|
T.V.Sundaram, EE/Electrical, transferred.
|
|
R.JAYANTHI,
AEE/Electrical
C&I/Sirkali/
Nagapattinam EDC
|
EE/O&M/Kurinjipadi
Cuddalore EDC
|
Existing Vacancy
|
|
M.BHUVANESHWARI,
AEE/Electrical/MM-I/ Chennai
|
EE/Operation/
Gummidipoondi/
Chennai EDC (North)
|
Aruna Muralidharan,
AEE/Electrical, whose order is modified.
|
|
S.JEYANTHI,
AEE/Electrical/Data
Cell
O/o.SE/RE & I (D)/
Chennai
|
EE/Operation/230/
110 KVSS Vysarpadi/
Chennai EDC (North)
|
M.Saganvali,
EE/Electrical, transferred.
|
|
C.SANKAR,
AEE/Electrical,
O/o.SE-II/ APDRP/
Chennai
|
EE/Electrical/O&E/
NCTPS Stage-II
(2x600 MW)
|
M.Soundararajan,
EE/Electrical, transferred.
|
|
V.UMAMAHESWARI,
AEE/Electrical/
O/o.CE/Mechanical/
Thermal Station/
Chennai
|
EE/Stores,
O/o.SE/MM-I/Chennai
|
V.Subramanian, EE/Electrical, transferred.
|
|
S.VEENA,
AEE/Electrical
Planning/Chennai
|
EE/230/110 KV/GIS SS/
Hybrid/Thiruverkadu
Chennai EDC (West)
|
T.Hemalatha,
EE/Electrical, transferred
|
..3..
..3..
Sl.
No.
|
Name and Designation
THIRUVALARGAL/TMTY
|
Place of Posting
|
In the place of
THIRUVALARGAL/TMTY
|
(1)
|
(2)
|
(3)
|
(4)
|
|
J.R.SHANTHI,
AEE/Electrical,
O/o.CE/Commercial/
Chennai
|
EE/DSM (Now R&C),
O/o.CE/Commercial/
Chennai
|
Existing Vacancy
|
|
B.G.SARASWATHY, AEE/Electrical/Constn./
Rural/Mettupalayam/
Coimbatore EDC (North)
|
EE/O&M/Gobi
Gobi EDC
|
Existing Vacancy
|
|
V.S.VENNILA,
AEE/Electrical/Rural/
North/Panruti/
Cuddalore EDC
|
EE/O&M/Villupuram
Villupuram EDC
|
Existing Vacancy
|
|
J.ANGUSWAMY,
Executive Assistant to
CMD/TANGEDCO/
Secretariat Branch
|
EE/Electrical,
(EA to CMD/TANGEDCO)
|
Up-graded post vide (Per.) CMD TANGEDCO Proceedings
No.88 (SB) dated 24.05.2016
|
|
K.M.KOMAGAL,
AEE/Electrical/SSE/
Salem/GCC/Salem
|
EE/VGTPS/Ramnad
|
Existing Vacancy
|
|
P.S.UJJAYANTHI,
AEE/Electrical, O/o.SE/Planning/
Chennai
|
EE/General-cum-MRT/
Chennai EDC (West)
|
S.Ranganathan, EE/Electrical, transferred.
|
|
V.VIDHYA,
AEE/Electrical
O/o.CE/Mechanical/
Coal/Chennai
|
EE/Electrical/Division-II
Coal/Chennai
O/o.SE/Coal/Chennai
|
V.K.Jayaprakasan,
EE/Electrical, transferred.
|
|
K.KANNAN,
AEE/Electrical/MM/ Chenglepet
EDC
|
EE/O&M/Chenglepet
|
Existing Vacancy
|
|
T.SAMUEL SUNDARRAJ
SARGUNAR,
AEE/Electrical/Instn.I/
TTPS
|
EE/230 KVSS/Auto SS/
Tuticorin/Tuticorin EDC
|
S.Rajan Raj, EE/Electrical, transferred.
|
..4..
..4..
Sl.
No.
|
Name and Designation
THIRUVALARGAL/TMTY
|
Place of Posting
|
In the place of
THIRUVALARGAL/TMTY
|
(1)
|
(2)
|
(3)
|
(4)
|
|
N.JESU ANTONY
SAHAYA
NIXON,
AEE/Electrical/O&E
TTPS
|
EE/O&M/Gudiyatham/ Thiruppathur EDC
|
K.Balasubramaniam,
EE/Electrical, transferred.
|
|
G.HEMALATHA,
AEE/Electrical/MM
Chennai EDC (South)
|
EE/400 KV, O/o.SE/Transmission-II/ Chennai
|
L.Ragu,
EE/Electrical,
transferred
|
|
S.ALAMAR SELVAN,
AEE/Electrical/MRT-I TTPS
|
EE/MRT-I/TTPS
|
A.Ravichandran, AEE/Electrical, whose order is
modified.
|
|
K.RADHIKA,
AEE/Electrical/O&M/
South/Kumbakonam/
Thanjavur EDC
|
EE/O&M/Mannargudi/
Tiruvarur EDC
|
Existing Vacancy
|
|
R.DEIVAYANAI,
Senior Manager/
Thanjavur EDC
|
EE/General/Trichy EDC
(Metro)
|
R.Sridharan, EE/Electrical, transferred.
|
|
K.SADATHUNNISA,
AEE/Electrical/
230 KVSS/Pasumalai/
Madurai EDC
|
EE/O&M/Paramakudi/
Ramnad EDC
|
P.Kumar, EE/Electrical, transferred.
|
|
V.GNANAMOORTHY, AEE/Electrical/P&C/
Thudialur/Coimbatore
|
EE/MRT/Udumalpet/
Udumalpet EDC
|
Existing Vacancy
|
|
PATRICIA THANGARAJ,
AEE/ Electrical/MM/
O/o.SE/Chennai EDC
(Central)
|
EE/230 KVSS/Manali/
Chennai EDC (North)
|
Existing Vacancy
|
|
G.SAVITHIRI,
AEE/Electrical/MM-II/
Chennai-2
|
EE/TS/ETPS
|
Existing Vacancy
|
..5..
..5..
..5..
3. The names found in the panel as Sl.No.63
Thiru K.S.Harihara Subramanian and Sl.No.66 Thiru B.Subramanian, AEEs./Electrical
have relinquished promotion temporarily and voluntarily retired from service on
30.09.2015 A.N., respectively.
4.
The Chief Engineers/Superintending Engineers concerned are directed to relieve the officials under orders of
promotion and postings immediately by
making local arrangements without waiting for substitutes and instruct them to
join at the new post before expiry of
joining time. A report should be sent
to the Tamil Nadu Generation and Distribution
Corporation Limited regarding the date
of relief and
date of joining
of the officials. This will be apart from the Certificate
of Transfer of Charge.
5. The Chief Engineers/Superintending
Engineers concerned are also directed to
ensure that whether, any disciplinary proceeding is pending/charges framed/ punishment
awarded, if any, against the official mentioned in para-1 above, before serving
the promotion order. If so, necessary
clarification may be obtained from the Secretary before serving the said
promotion order to the official concerned.
6.
An option format is enclosed herewith.
The officials mentioned in
para-1 above are requested to
return the option format
duly filled in,
within one month from
the date of promotion and assumption of charge. If the option format is not received
within the said period of one month, their pay in the
higher post will be fixed as specified in para-3 of Board’s Memo.
No.75406/P1/90-1, dated
19.3.1991.
(BY ORDER OF THE CHAIRMAN CUM MANAGING DIRECTOR)
R.BALAJI
SECRETARY
To
Tmty.A.BARATHI,
AEE/Electrical/Planning
Through:- The Chief
Engineer/Distribution/Villupuram EDC
|
Tmty.R.JAYANTHI, AEE/
Electrical/C&I/Sirkali
Through:- The
Superintending Engineer/Nagapattinam EDC
|
Tmty.M.BHUVANESHWARI,
Assistant Executive Engineer/Electrical
Through:- The
Superintending Engineer/MM-I/Chennai
|
Tmty.S.JEYANTHI,
Assistant Executive Engineer/Electrical/DATA Cell
Through:- The Superintending
Engineer/RE&I (D)/Chennai
|
Thiru C.SANKAR,
Assistant Executive Engineer/Electrical
Through:- The Superintending
Engineer/R-APDRP/Chennai
|
Tmty.V.UMAMAHESWARI,
Assistant Executive Engineer/Electrical
Through:- The Chief
Engineer/Mechanical/Thermal Station/Chennai
|
Tmty.S.VEENA, Assistant
Executive Engineer/Electrical
Through:- The
Superintending Engineer/Planning/Chennai
|
..6..
..6..
..6..
Tmty.J.R.SHANTHI,
Assistant Executive Engineer/Electrical
Through:- The Chief
Engineer/Commercial/Chennai
|
Tmty.B.G.SARASWATHY,
AEE/Electrical/Constn./Rural/Mettupalayam
Through:- The
Superintending Engineer/Coimbatore EDC (North)
|
Tmty.V.S.VENNILA, AEE/Electrical/Rural/North/Panruti
Through:- The
Superintending Engineer/Cuddalore EDC
|
Thiru J.ANGUSWAMY,
Executive Assistant to CMD/TANGEDCO
Through: The
Secretary/TANGEDCO/Chennai
|
Tmty.K.M.KOMAGAL,
Assistant Executive Engineer/Electrical/SSE/Salem
Through:- The
Superintending Engineer/GCC/Salem
|
Tmty.P.S.UJJAYANTHI,
Assistant Executive Engineer/Electrical
Through:- The Superintending
Engineer/Planning/Chennai
|
Tmty.V.VIDHYA,
Assistant Executive Engineer/Electrical
Through:- The Chief
Engineer/Mechanical/Coal/Chennai
|
Thiru K.KANNAN,
Assistant Executive Engineer/Electrical/MM
Through:- The
Superintending Engineer/MM/Chenglepet EDC
|
Thiru T.SAMUEL
SUNDARRAJ SARGUNAR, AEE/Electrical/Instn.I/TTPS
Through:- The
Superintending Engineer/P&A/TTPS
|
Thiru N.JESU ANTONY
SAHAYA NIXON, AEE/Electrical/O&E/TTPS
Through:- The
Superintending Engineer/P&A/TTPS
|
Tmty.G.HEMALATHA,
Assistant Executive Engineer/Electrical/MM
Through:- The
Superintending Engineer/Chennai EDC (South)
|
Thiru S.ALAMAR SELVAN,
Assistant Executive Engineer/Electrical/MRT-I/TTPS
Through:- The
Superintending Engineer/P&A/TTPS
|
Tmty.K.RADHIKA,
AEE/Electrical /O&M/South/Kumbakonam
Through:- The
Superintending Engineer/Thanjavur EDC
|
Tmty.R.DEIVAYANAI,
Senior Manager
Through:- The
Superintending Engineer/Thanjavur EDC
|
Tmty.K.SADATHUNNISA,
AEE/Electrical/230 KVSS/Pasumalai
Through:- The
Superintending Engineer/Madurai EDC
|
Thiru V.GNANAMOORTHY,
AEE/Electrical/P&C/Thudialur
Through:- The
Superintending Engineer/P&C/Coimbatore
|
..7..
..7..
..7..
Thiru PATRICIA
THANGARAJ, AEE/Electrical/MM/CO
Through:- The
Superintending Engineer/Chennai EDC (Central)
|
Tmty.G.SAVITHIRI, Assistant
Executive Engineer/Electrical
Through:- The
Superintending Engineer/MM-II/Chennai-2
|
Copy
to:
The
Director/Generation/TANGEDCO/Chennai
The Director
(Distribution)/TANGEDCO/Chennai
The Director General of
Police/Vigilance/Chennai
The Legal Adviser/TANGEDCO/Chennai,
The Managing
Director/TANTRANSCO/Chennai
The
Director/Projects/TANGEDCO/Chennai
The Director/Transmission
Projects/TANTRANSCO/Chennai
The
Director/Operation/TANTRANSCO/Chennai,
The Chief
Engineers/TANGEDCO/TANTRANSCO
The Director/Finance/TANGEDCO/Chennai.
The
Director/Finance/TANTRANSCO/Chennai.
The Chief Financial
Controller/General/TANGEDCO/Chennai
The Chief Financial
Controller/TANTRANSCO/Chennai.
The Chief Financial
Controller/Revenue/TANGEDCO/Chennai
The Chief Financial
Controller/Regulatory Cell/TANGEDCO/Chennai
The Superintending
Engineer/Villupuram EDC
The Superintending
Engineer/Nagapattinam EDC
The Superintending
Engineer/MM-I/Chennai
The Superintending
Engineer/Thermal Purchase/Chennai
The Superintending
Engineer/Planning/Chennai
The Superintending
Engineer/Coimbatore EDC (North)
The Superintending
Engineer/Cuddalore EDC
The Superintending
Engineer/GCC/Salem
The Superintending
Engineer/Chenglepet EDC
The Superintending
Engineer/P&A/TTPS
The Superintending
Engineer/Chennai EDC (South)
The Superintending
Engineer/Thanjavur EDC
The Superintending
Engineer/Madurai EDC
The Superintending
Engineer/P&C/Coimbatore
The Superintending
Engineer/Chennai EDC (Central)
The Superintending
Engineer/MM-II/Chennai
The Superintending
Engineer/Chennai EDC (North)
The Superintending
Engineer/P&A/NCTPS-II
The Superintending
Engineer/Chennai EDC (West)
The Superintending
Engineer/Gobi EDC
The Superintending
Engineer/VGTPS/Ramnad
The Superintending
Engineer/Coal/Chennai
The Superintending
Engineer/Tuticorin EDC
The Superintending
Engineer/Thiruppathur EDC
..8..
..8..
The Superintending
Engineer/Transmission-II/Chennai
The Superintending
Engineer/Tiruvarur EDC
The Superintending
Engineer/Trichy EDC (Metro)
The Superintending Engineer/Ramnad
EDC
The Superintending
Engineer/Udumalpet EDC
The Superintending
Engineer/P&A/ETPS
The Superintending
Engineer/Computer Centre/Chennai
The Chief Internal Audit
Officer.
The Deputy
Secretary/Personnel/Administration/Miscellaneous /TANTRANSCO/SB
The Chief Public
Relations Officer.
The Under
Secretary/Services/Secretariat Branch
The Under
Secretary/General/Secretariat Branch
The Executive Assistant
to Chairman cum Managing Director/TANGEDCO.
The Senior Private
Secretary to Chairman Cum Managing Director/Secretary
Administrative Branch
Computer Centre
Vigilance Cell
A2, A5, A13, A15, A20,
A22, A23 and A25 Sections/Secretariat Branch
// TRUE COPY : : FORWARDED : : BY ORDER //
SECTION OFFICER
No comments:
Post a Comment