TAMIL NADU
GENERATION AND DISTRIBUTION CORPORATION LTD.
ADMINISTRATIVE BRANCH
From
Er. A.V.RAVI, M.E., M.I.E.,,
Chief Engineer/Personnel,
8th
Floor, N.P.K.R.R. Maaligai, 144,
Anna Salai,
Chennai – 600 002.
To
The Superintending Engineers Concerned.
Sir,
Sub: Recruitment - Direct Recruitment to the post of Technical Assistant/Electrical - Allotment
of selected candidates – Order - Issued.
Ref: Letter No.109680/767G.57/G.571/2013,
dated 25.02.2014.
-o0o-
In continuation of the above ref. cited, I am to inform you that 21 Nos. candidates who have been selected
for the post of Technical Assistant/Electrical
through Direct Recruitment, are allotted to the circle as per annexure enclosed herewith.
2)
Therefore, I am to request you to arrange
to issue appointment order to the concerned candidates as in Annexure enclosed
with the terms and
conditions enclosed herewith.
3)
It is also requested to get
Genuineness Certificate in respect of
Technical Qualification of the candidate
from the concerned
Education Department and after verifying Genuineness Certificate, appointment order may be issued to them.
4)
The appointment order may be
issued to the selected candidates as
per the allotment appended herewith without any deviation.
5)
In this connection, I am to request you to arrange
to verify the following original certificates thoroughly by the responsible officer of your circle, as and when report for duty by the
selected candidates.
(i)
Original certificates from
School/College in Proof of Date of Birth
and Certificate for Educational Qualification for verification before joining duty.
(ii) Community Certificate.
…………2…
::
2 ::
(iii) A certificate of Physical Fitness
obtained from a Medical Officer not lower in rank than that of a
Civil Assistant Surgeon. In case of differently abled persons
relevant certificates may also be verified.
(iv) If the candidates is employed, he should get proper relief from
present employer before joining the services of TANGEDCO.
6)
I request that the original
certificate produced by the candidate
shall be verified thoroughly and discrepancies, if any, noticed
shall be reported
to this office immediately.
7)
The form of Physical Fitness
Certificate has already been sent to the
selected candidate. The Physical Fitness Certificate produced to be by the candidate may be verified
based on the guidelines issued
in Adm. Branch, Memo No.134/730/R.II(1)/85-1,
dated 20.12.1995 (Published in TNEB Gazette)
and defective certificate may be returned to the candidate for
rectification of the defects by the
Medical Office who issued the certificate with his dated attestation.
8)
The candidate who do not
possess adequate knowledge in Tamil may be directed to pass second
language test within the period
as per Service Regulations and entry to the effect may be made in the
Service Book of the individual.
9)
I request you to intimate the date of joining of the selected candidate promptly.
Encl.: Annexure.
sd/- 17/02/2015 (A.V.RAVI)
CHIEF ENGINEER/PERSONNEL.
Copy to the Chief Engineers concerned
Copy to the Deputy Chief Engineer/Adm. Branch/ Ch.2
SELECTION
LIST OF TECHNICAL ASSISTANT/ELECTRICAL BY
DIRECT RECRUITMENT (21
NOS.) AS PER COURT DIRECTION
|
|
|
|
QUA
|
|
DATE
|
|
|
|
SL.
|
APPL.
|
|
GEN
|
LIFI
|
COMM
|
PRIO
|
ALLOTED
|
|
|
NAME
& ADDRESS
|
OF
|
|
|||||||
NO.
|
NO.
|
DER
|
CAT
|
UNITY
|
RITY
|
CIRCLE
|
|
||
|
BIRTH
|
|
|||||||
|
|
|
|
ION
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
S.Radhakrishnaa
|
|
|
|
|
|
|
|
|
|
Pullaiyam Palayam,
|
|
|
|
|
|
|
|
1
|
3500
|
Punnam
Chatiram (Post)
|
M
|
EEE
|
MBC/
|
10.06.1980
|
3.2
|
KARUR E.D.C.
|
|
Aravakuruchi (Taluk),
|
DC
|
|
|||||||
|
|
|
|
|
|
|
|
||
|
|
TNPLl (via)
|
|
|
|
|
|
|
|
|
|
Karur
- 639 136
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M.John
Bosco
|
|
|
|
|
|
|
|
|
|
S/o.
S.Maria Micheal
|
|
|
|
|
|
|
|
2
|
6769
|
East
Street,
|
M
|
EEE
|
BCO
|
26.03.1979
|
|
DINDIGUL
|
|
Karisal Patty,
|
|
E.D.C
|
|
||||||
|
|
|
|
|
|
|
|
||
|
|
Palayakannivadi
(Po)
|
|
|
|
|
|
|
|
|
|
Dindigul
- 624 705.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A.Pandiarajan
|
|
|
|
|
|
|
|
3
|
1564
|
T.Paraipatty,
|
M
|
EEE
|
SC
|
22.04.1983
|
2.2
|
DINDIGUL
|
|
T.Vadugapathy (Post)
|
E.D.C
|
|
|||||||
|
|
|
|
|
|
|
|
||
|
|
Dindigul
- 624 308.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
S.Selvakumar
|
|
|
|
|
|
|
|
|
|
S/o. V.Sakthivel
|
|
|
|
|
|
GENERATION
|
|
|
|
1/31, Chettia Patti,
|
|
|
|
|
|
|
|
4
|
1561
|
M
|
EEE
|
SC
|
16.02.1985
|
2.2
|
CIRCLE/
|
|
|
Malayasoundanpatti,
|
|
||||||||
|
|
|
|
|
|
|
KUNDHA
|
|
|
|
|
Nilakkottai
(Taluk)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Dindigul
- 624 206.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
S.Priyadharshini
|
|
|
|
|
|
|
|
|
|
151/K-1,
DR. Subbrayan
|
|
|
MBC/
|
|
|
KANYAKUMARI
|
|
5
|
7181
|
Nagar,
|
F
|
EEE
|
31.03.1989
|
|
|
||
DC
|
|
E.D.C
|
|
||||||
|
|
Mettur
Dam,
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
Salem - 636 401.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
M.Venkateswaran
|
|
|
|
|
|
|
|
|
|
No.47, Eswar Nagar,
|
|
|
|
|
|
CHENNAI
|
|
6
|
2917
|
Moorai,
Veerapuram,
|
M
|
EEE
|
BCO
|
15.03.1984
|
2.3
|
|
|
E.D.C/WEST
|
|
||||||||
|
|
Avadi, Chennai
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Thiruvallur - 600 055.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
THANKS TO TNEBES
No comments:
Post a Comment