Record Assistant Panel &Allotment Orders


View Download



View Download

Experience counted for considering Promotion as Line Inspector – Mazdoor Period – clarification sought for

TAMILNADU GENERATION & DISTRIBUTION CORPORATION
                                                  (Administrative Branch)
                                                                                                                144, Anna Salai,
                                                                                                                   Chennai - 2.
Memo No.017321/234/G.46/G.462/2015-7, dt.27.12.2016.
                          Sub: Estt. - Electricity Distribution Circle – Experience
                                  counted for considering  Promotion as Line Inspector 
                                 – Mazdoor Period – clarification sought for – Reg.

TNEB Pensioners D.A.Arrears From 01.07.16 to 30.11.2016


Vartha Cyclone General Instruction Orders


View Download

T.V.Malai & Vellore Dt. Vartha Cyclone order


View Download

4 AE (Elec) to AEE Promotion Suitability Called For

BY E-MAIL
PANEL / IMMEDIATE

TAMIL NADU GENERATION & DISTRIBUTION CORPORATION LTD.
ADMINISTRATIVE BRANCH

From

Er. A.V.RAVI, M.E., M.I.E.,
Chief Engineer/Personnel
8th Floor, N.P.K.R.R., Maaligai,
144, Anna Salai, Chennai – 600 002.
To

The Superintending Engineers concerned.

Letter No.083907/156/G.1/G.11/2015- 9, dated: 19.12.2016.

Sir,
Sub:
TANGEDCO – Estt – Class II Service – Inter-se-seniority of AE/Electrical for the year 2005 – Certain AE/Electrical names are inclusion in the list of seniority to the post of AE/Electrical for the year 2005 – Suitable for promotion as AEE/Elecl. – Suitability report , DP & Service Particulars – Called for – Reg.

கரூர் மின் பகிா்மான வட்டத்தில் 55 மின்வாரிய ஒப்பந்த தொழிலாளர்கள் பணி நிரந்தரம்செய்ய உயர்நீதிமன்றமதுரை கிளை உத்தரவு

மின்வாரிய ஒப்பந்த தொழிலாளர்கள் 55 பேரை பணி நிரந்தரம் செய்ய தனி நீதிபதி பிறப்பித்த உத்தரவை எதிர்த்து மின்வாரியம் தாக்கல் செய்த மேல்முறையீடு மனுவை சென்னை உயர்நீதிமன்ற மதுரைக் கிளை தள்ளுபடி செய்தது.கரூர் மாவட்டத்தில் மின்வாரிய ஒப்பந்த தொழிலாளர்களாக பணிபுரியும் அசோக் உள்ளிட்ட 55 பேர் தங்களை பணி நிரந்தரம் செய்யக்கோரி தொழிலாளர் நீதிமன்றத்தில் வழக்கு தொடர்ந்தனர்.இந்த வழக்கை விசாரித்த நீதிமன்றம், 55 பேரும் ஒப்பந்த தொழிலாளர்களாக பணி முடித்த 480 நாளில் இருந்து அவர்களைப் பணி நிரந்தரம் செய்ய மின்வாரியத்துக்கு 2010 ஜனவரியில் உத்தரவிட்டது.இந்த உத்தரவை எதிர்த்து மின் வாரியம் சார்பில் சென்னை உயர்நீதிமன்ற மதுரைக் கிளையில் மேல்முறையீடு செய்யப்பட்டது.


இந்த மேல்முறையீடு மனுவை 2014-இல் தனி நீதிபதி தள்ளுபடி செய்தார்.
இந்த உத்தரவை எதிர்த்து மின் வாரியம் தரப்பில் மேல்முறையீடு மனு தாக்கல் செய்யப்பட்டது.அதில், மனுதாரர்கள் ஒப்பந்த அடிப்படையில் மின் கம்பம் நடுவது, வயர்கள் பதிப்பது போன்ற பணிகளைச் செய்து வந்தனர். அவர்களுக்கும் மின் வாரியத்துக்கும் நேரடி தொடர்பு இல்லை. அவர்களுக்கு உதவிப் பொறியாளர்கள் பணிச் சான்று வழங்கியதாக கூறியுள்ளனர். பணிச்சான்று வழங்க உதவிப் பொறியாளர்களுக்கு அதிகாரம் கிடையாது. எனவே அதன் அடிப்படையில் அவர்களைப் பணி நிரந்தரம் செய்யக்கோருவது முறையல்ல என்று குறிப்பிடப்பட்டிருந்தது.இந்த மனு நீதிபதிகள் எம்.சத்தியநாராயணா, ஜெ.நிஷாபானு ஆகியோர் அடங்கிய அமர்வு முன்பு விசாரணைக்கு வந்தது.அப்போது, மனுதாரர்கள் 1998-இல் இருந்து மின்வாரியத்தில் பணிபுரிகின்றனர். அவர்களைப் பணி நிரந்தரம் செய்தால் நிரந்தர ஊழியர்களுக்கான சலுகைகள், பணப் பலன்களை வழங்க நேரிடும் என்ற காரணத்தால் பணி நிரந்தரம் செய்யாமல் வைத்துள்ளனர் என மனுதாரர் தரப்பில் வாதிடப்பட்டது.இதைப் பதிவு செய்த நீதிபதிகள் பிறப்பித்த உத்தரவு:
ஒப்பந்த தொழிலாளர்கள் பணி நிரந்தரம் செய்வது தொடர்பாக 2004-ஆம் ஆண்டிலேயே உயர்நீதிமன்றம் உத்தரவிட்டுள்ளது. அந்த உத்தரவுப்படி மின் வாரியத்தின் மேல்முறையீடு மனுவை ஏற்க முடியாது என்று கூறி மனுவைத் தள்ளுபடி செய்து, ஒப்பந்த தொழிலாளர்களை பணி நிரந்தரம் செய்ய உத்தரவிட்டனர்.
BEFORE THE MADURAI BENCH OF MADRAS HIGH COURT            

DATED: 24.11.2016

Reserved on :   11.11.2016

Delivered on :  24.11.2016

CORAM

THE HONOURABLE MR. JUSTICE M.SATHYANARAYANAN            

and

THE HONOURABLE MRS.JUSTICE J. NISHA BANU        

WA.(MD). Nos.339 of 2015 and 340/2015 & MP (MD) Nos.2 & 2/2015 & CMP (MD)    
No.10630/2016 in WA.(MD) No.339/2015

1.The Chairman
   Tamil Nadu Electricity Board
   800, Anna Salai, Chennai-2.

2.The Chief Engineer [Personnel]
   Tamil Nadu Electricity Board
   800, Anna Salai, Chennai-2.

3.The Superintending Engineer
   TANGEDCO, Karur Electricity
   Distribution Circle, Karur.                                  ..
Appellants                                                                 in both the
writ appeals

                                        Versus                                        

1.The Inspector of Labour
   Karur.

Local Holiday 12.12.2016 in Thiruvannamalai Distribution Circle in Connection with MAHA DEEPAM Festival Orders

TAMIL NADU GENERATION & DISTRIBUTION CORPORATION

Office of the Superintending  Engineer,
TEDC/Thiruvannamalai.

Memo.No. 16620/225/Adm-1/A-4/F. local Holiday/2016, dated:09.12.2016.


Sub: Holidays  Local Holiday  12.12.2016 in Thiruvannamalai
Distribution Circle in Connection with MAHA DEEPAM Festival
Orders- issued.

மிலாதுநபி விடுமுறை 13.12.16 மாற்றம் சம்பந்தமான வாரிய ஆணை


View Download

R.W.E. - Filling up of vacancies of Driver post by Internal Selection Proposal Called for

TANGEDCO
ADMINISTRATIVE BRANCH

From
Er.A.V.RAVI, M.E, M.I.E.,
Chief Engineer/Personnel,
VIII Floor, N.P.K.R.R. Maalagai,
144, Anna Salai,
Chennai – 2.
To
All Superintending Engineers.


Lr.No.082598/536/G.56/G.561/2015-2, Dated: 02.12.2016.

Sir,

Sub: Recruitment  – R.W.E. - Filling up of vacancies of Driver post     
        by Internal  Selection – Proposal – Called for – Regarding.

OMBUDSMAN Appeal Petition Sr No 68 To 93

தமிழ் எழுத்துக்களை கைபேசியில் காணஇயலாது கணனியில் பாா்கவும்..

Sr. NoPetition No.Appeal ByDetails of Case
(Click on the Detail to view the order)
Order Date Uploaded on
9343 of 2016
Dr. Elangovan,
No.1-A, Sambasivam Pillai Street,
Ariyalur.
30.11.201630.11.2016
9251 of 2016
Thiru. Jothi,
S/o Perumal,
Maarakkanam Tk,
Villupuram Dist.
23.11.201624.11.2016
9119 of 2016
M/s Kingston Victor,
C/o Stephen & Stephen, 
Indira Nagar, Indira Nagar, Chennai20
23.11.201623.11.2016
9023 of 2016M/s Kingsly,
C/o Stephen & Stephen,Indira Nagar,                                     Chennai - 600 020.       
18.11.201621.11.2016
8922 of 2016
M/s Harish Vasanji,
C/o Stephen & Stephen,
Indira Nagar, Chennai
18.11.201621.11.2016
8821 of 2016
M/s Sharath Vasanji,
C/o Stephen & Stephen,           
Indira Nagar,                           Chennai
18.11.201621.11.2016
8720 of 2016
M/s Sharath Vasanji,
C/o Stephen & Stephen,
Indira Nagar, Chennai
17.11.201621.11.2016
8618 of 2016
M/s Venture Metal Products,
C/o Stephen & Stephen,
Indira Nagar,Chennai -20
17.11.201621.11.2016
8575 of 2016
ÂU. A. gh©oa‹,
j/bg G. MWKf«,
bgçah® ef® bj‰F,
éU¤jh¢ry«
16.11.201618.11.2016
8447 of 2016
M/s Harihar Alloys Private Ltd.,
1/43, Race Course Road,
Kajamalai,
Trichy .
The  Appellant prayed to direct the Respondent to give effect to the reduction of load  and refund the excess amount.16.11.201618.11.2016
8355 of 2016
Thiru. N.B. Sathynarayanan,
Iyyappanthangal,
Chennai 600 056
14.11.201615.11.2016
8260 of 2016
ÂU. K. fªjrhä,
j/bg fhë fΩl®,
1 Éth ÅÂ,
tujuh#òu«, nfhit  641 015.
3.11.20164.11.2016
8137 of 2016
ÂU. mu. VGkiy,
r£lk§fy« »uhk«,
kiwkiy ef®, fhŠÁòu« kht£l«.
31.10.20161.11.2016
8049 of 2016
ÂU. nfh. e«khœth®,
524, y£Räòu«,
nk‰F fhyâ,
nfhéšg£o
31.10.20161.11.2016
7933 of 2016
Thiru. V. Murugan,
Anandam Colony,
7H, V.M. Chatram Road,
Tirunelveli – 627 011.
31.10.20161.11.2016
7831 of 2016
ÂU. Â. bgh‹Drhä,
j/bg bgh. Âahfuh#‹,
ehfš ef®,
©L¡fš  3.
21.10.201625.10.2016
7710 of 2016
M/s G.J. Spinners,
 Sendrayanpalayam,
D.G. Pudur, 
Gobichettipalayam.
19.10.201625.10.2016
7662 of 2016
ÂU. nf. Ïs§nfht‹,
j/bg fU¥igah¥ÃŸis,
ÏyhšFo t£l«,                     ÂU¢Áuh¥gŸë
18.10.201618.10.2016
754  of 2016
M/s K.P. Blue Metal,
No.27A, M.B.T. Road,
Navalpur,
Ranipet
17.10.201618.10.2016
7457 of 2016
ÂU. A. AÕ¥ uAkh‹,
v©.90, Ïuæšnt nuhL,
MLJiw.     
8.10.201613.10.2016
7352 of 2016
ÂU. A.S.C. mU©Fkh®,
j/bg. v°. rªÂunrfu‹,
20/7, Ïuhr¥g Kjèah® ÅÂ,
Midkiy  642 104.           
7.10.201613.10.2016
7241 of 2016
ÂU. P. Fkhurhä,
j/bg bgça j«Ã fΩl®,
My¤Jbfh«ig »uhk«
r¤Âak§fy«.
5.10.20167.10.2016
7167 of 2016ÂU. Fr. b#. #h‹ n#hr¥ bf‹do, mŠrš ef®,          kJiu  18.       30.9.20163.10.2016
7017 of 2016
M/s Orchid Chemicals  & Pharmaceuticals Ltd.,
Nungambakkam,
Chennai – 34.
30.9.20163.10.2016
6942  of 2016
ÂU. N. mdªjrad«, M.A., B.L.,
rkaešÿ® (tê) ,
kJiu kht£l« - 625 402.
28.9.201629.9.2016
6835 of 2016M/s Ayyanar Matriculation Higher Secondary School, 
Veppur & Taluk,
Cuddalore District.
28.9.201629.9.2016

Executive Engineer / Electrical - Transfer and Postings - orders - issued.

TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LIMITED
(SECRETARIAT BRANCH)
                                               
                                                                                                144, ANNA SALAI
                                                                                                CHENNAI-600 002.

Memorandum No.67100 /A1/A11/2016-1,   dated  30.11.2016


         Sub:    Establishment - Class I Service - Executive  Engineer/Electrical –
                   Transfer and Posting - Orders - Issued.

Provincial/RWE - Vacancy position - Called for

TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LTD.,
(Administrative Branch)

From

Er. A.V.RAVI, M.E., M.I.E.,
Chief Engineer/Personnel,
144, Anna Salai,
Chennai 600 002.
To

All Chief Engineers,
All Superintending Engineers.


Letter No. 098383/1533/G.42/G.421/2016-1,   dt.   29.11.2016.

Sir,


Sub
:
Estt. – Provincial/RWE - Vacancy position - Called for - Regarding.




-----

                   All Chief Engineers and Superintending Engineers are requested to furnish the vacancy position out of sanctioned post as on date in respect of Provincial/RWE Cadres (category wise) immediately to this office for taking necessary action.

Assessors - Promotion to the post of Inspector of Assessment - D.P. and suitability Reports

  பதிவிறக்கம் செய்ய இங்கே கிளிக் செய்யவும் 

TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION
Administrative Branch
From
Er. A.V.RAVI, M.E., M.I.E.,
Chief Engineer/ Personnel,
144, Anna Salai,
Chennai - 600 002.

To

All the Superintending Engineers,
               Electricity Distribution  Circle,



Letter No.031134/308/G25/G252/2016-1, dated  28.11.2016.

Sir,

Sub :
Establishment  - Class III Service - Assessors  -  Promotion to the post of Inspector of Assessment - D.P. and suitability Reports - Called for.

Work Load Sub-Committees Orders



Enhancement of Maternity Leave to 270 days Adoption in TANGEDCO Orders

TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LTD
                      (ABSTRACT)
 
ESTABLISHMENT – TANGEDCO - MATERNITY LEAVE – Enhancement of  Maternity Leave to 270 days – Orders issued by the Government – Adoption in TANGEDCO – Orders - Issued.
-------------------------------------------------------------------------------------------------------
(SECRETARIAT BRANCH)

(PER) CMD TANGEDCO PROCEEDINGS NO.195,       DATED: 25th  November 2016.

பழைய 500, 1000 ரூபாய் நோட்டின் மூலம் டிசம்பர் 15 வரை மின்கட்டமணம் செலுத்தலாம்.

பழைய 500, 1000 ரூபாய் நோட்டின் மூலம் டிசம்பர் 15 வரை மின்கட்டமணம் செலுத்தலாம் Sir/Madam,

Sub:TG-LT colln old Rs.500/- notes-during-25.11.2016 to 15.12.2016.

TANGEDCO to collect old Rs.500/-  notes only from 25.11 2016 to 15.12.2016 from the LT individual/household consumers for the payment of arrears/current bills only & not for the collection of advance/other charges. Amount only to the bill value shall be collected.LT colln counters' officials to ensure that amounts collected are remitted to TG account then & there.
Director(Finance)/TG

அரசு ஊழியர்கள் வாகனம் வாங்க வட்டியில்லா முன்பணம் ரத்து: மாநிலங்களவையில் மத்திய அரசு தகவல்

ஏழாவது மத்திய ஊதியக் குழு பரிந்துரையின்படி, அரசு ஊழியர்களுக்கு கார் உள்ளிட்ட வாகனங்கள் வாங்குவதற்கு வட்டியில்லா முன்பணம் வழங்கலை ரத்து செய்ய முடிவு செய்துள்ளதாக மாநிலங்களவையில் மத்திய அரசு தெரிவித்துள்ளது.


இது தொடர்பாக மாநிலங்களவை அதிமுக உறுப்பினர் கே.ஆர்.அர்ஜுனன், "ஏழாவது மத்திய ஊதியக் குழு அமலாக்கத்தில் அரசு ஊழியர்களுக்கு கார் உள்ளிட்ட வாகனங்கள் வாங்குவதற்கு முன்பணம் வழங்கும் நடைமுறை ஒழிக்கப்பட்டுள்ளதா?' என்று கேள்வி எழுப்பியிருந்தார்.
இதற்கு மாநிலங்களவையில் மத்திய நிதித் துறை இணை அமைச்சர் அர்ஜுன் ராம் மெஹ்வால் எழுத்துப்பூர்வமாக புதன்கிழமை அளித்துள்ள பதில் வருமாறு:
ஏழாவது மத்திய ஊதியக் குழு பரிந்துரைகளின்படி, அரசு ஊழியர்களுக்கு கார் உள்ளிட்ட வாகனங்கள் வாங்குவதற்கு முன்பணம் வழங்கப்படும் முறையை ரத்து செய்ய மத்திய அரசு முடிவு செய்துள்ளது. அவ்வப்போது வாகனங்கள் வாங்குவதற்கான சில திட்டங்கள் சந்தையில் நடைமுறையில் இருப்பதைக் கருத்தில் கொண்டு வாகன முன்பணம் வழங்குவதை ரத்து செய்யுமாறு ஊதியக் குழு பரிந்துரை செய்திருந்தது. இப்பரிந்துரையை அரசு ஏற்றுக் கொண்டுள்ளது என்று அமைச்சர் அதில் தெரிவித்துள்ளார்.

சம்பளம் எடுப்பதற்காக அரசு ஊழியர்கள், ஆசிரியர்களுக்குச் சிறப்பு தற்செயல் விடுப்பு வழங்கிட கோரிக்கை

பணம் எடுப்பதற்காக அரசு ஊழியர்கள், ஆசிரியர்களுக்குச் சிறப்பு தற்செயல் விடுப்பு வழங்கிட அரசு யோசிக்க வேண்டும் என கோரிக்கை எழுந்துள்ளது. 

குடும்பக் கட்டுப்பாடு, இரத்த தானம், நாய்க்கடி போன்ற சில காரணங்களுக்காக வழங்கப்படும் சிறப்பு தற்செயல் விடுப்பினை தேசத்தின் விசேஷ நிலைமை கருதி பணம் எடுப்பதற்கான சிறப்பு தற்செயல் விடுப்பினை வழங்கிட அரசு முன்வர  வேண்டும்.

வாங்கும் சம்பளம், எடுக்க அனுமதிக்கப்பட்டுள்ள பண அளவு ஆகியவற்றை கருத்தில் கொண்டு எத்தனை நாட்கள் என்பதை முடிவு செய்திடலாம்..

Assessor Gr.II (932) to Assessor Feb-2014 Seniority List Communicated

Lr.No.093322/9G26/G.263/2016 dt.19. 11.16  Assessor Gr.II (932) to Assessor Feb-2014 Seniority List Communicated


View    Download

Distribution Circle – Experience counted for considering Promotion as Line Inspector – Mazdoor Period – clarification sought for – Reg.

TAMIL NADU GENERATION & DISTRIBUTION CORPORATION
(Administrative Branch)
                                                          144, Anna Salai,
                                                                           Chennai - 2.




Memo No.07321/234/G.46/G.462/2015-5, dt. 14.11.2016.




         
Sub:
Estt. - Electricity Distribution Circle – Experience counted for considering  Promotion as Line Inspector – Mazdoor Period – clarification sought for – Reg.

TANGEDCO Departmental Tests-November- 2016-Postponement


Collection in LT counters -15th to 24th Nov 2016 -   Instructions issued

e-mail:
TANGEDCO
                                                                                      ACCOUNTS BRANCH
                                                                                      REVENUE DIVISION

Circular Memo No.CFC/Rev/FC/Rev/F.Collection/D.748/2016, dated 15.11.2016

Sub: TANGEDCO - Collection in LT counters -15th to 24th Nov 2016 -
                           Instructions issued - Reg.

Ref: (i) Circular Memo No.CFC/Rev/FC/Rev/F.Collection/D.732/2016,
                                dated 9.11.2016
                           (ii) Circular Memo No.CFC/Rev/FC/Rev/F.Collection/D.738/2016,
                               dated 10.11.2016
                           (iii) Circular Memo No.CFC/Rev/FC/Rev/F.Collection/D. 744/2016,
                                dated 11.11.2016
        (iv) Circular Memo No.CFC/Rev/FC/Rev/F.Collection(2)/D.744/2016,
                                dated 11.11.2016
        (v) Press Information Bureau –GOI-MoF-Release ID-153601,
                                dt.14.11.2016
*****
                    
                       Further to the reference (v) cited, the following instructions are issued:

     a) TANGEDCO LT counters shall continue to collect the old Rs.500/- &
         Rs.1000/- notes in its counters from 15.11.2016 to 24.11.2016.
     b) The collection of old Rs.500/- & Rs.1000/- notes shall be restricted for the
         payments made only by LT individuals/households for arrears and/or
         current bills. No advance payments or any other charges will be allowed.
     c) The collection of old Rs.500/- & Rs.1000/- notes will not be extended for
         advance cc payments/any other payments.
     d) Since advance payments are not allowed, the officials concerned shall
         ensure that the amount only to the extent of the bill value is collected.    
     e) However the extension of time for the payment of electricity bills for the
        LT consumers as issued vide Circular under reference (i) may continue to
        have effect.  
  
                      The Superintending Engineers are instructed to adhere to the above instructions and the compliance report may be submitted to the undersigned.

(BY ORDER OF THE CMD/TANGEDCO)

To
All the Superintending Engineers/EDCs.
(P.T.O.)

Copy to:
All the Chief Engineers/Distribution Regions; H.Qrs. & Generating Stations.
The Chief Financial Controller/Revenue; Regulatory Cell; General & TANTRANSCO.
The Chief Engineer/Information Technology – suitable modifications in the LT software.
The Financial Controllers/H.Qrs. & Thermal Stations.
The CIAO; RAO; LA & Secretary.
Copy to the Asst. Personnel Officers/Tamil Development for published in the Bullettin
(2 Copies)
All the Directors of TANGEDCO & TANTRANSCO.
EA to the CMD.

::FORWARDED::BY ORDER::

Sd xxx (15.11.2016)
Chief Financial Controller/Revenue