TAMILNADU
GENERATION AND DISTRIBUTION CORPORATION LIMITED
(ABSTRACT)
Establishment - TANGEDCO
- Class I Service - Executive Engineers/Mechanical - Promotion and Postings -
Orders - Issued.
--------------------------------------------------------------------------------------------------------
(SECRETARIAT
BRANCH)
(Per.) CMD TANGEDCO Proceedings No.233 Dated the 10th October 2012
Purattasi 24, Nanthana
Thiruvalluvar Aandu 2043.
READ:-
(Per.) CMD TANGEDCO Proceedings
No.227 (SB) dated 28.09.2012.
*******
PROCEEDINGS:-
Under
Regulation 92 of the Tamil
Nadu Electricity Board Service
Regulations, read with the Tamil Nadu Electricity (Re-organisation
and Reforms) Transfer Scheme 2010, the
following 5 (Five only) Executive Engineers/Mechanical (Non-Independent) are regularly promoted and appointed as Executive
Engineers/ Mechanical in Category-3 Division-V, Class-I, of Tamil Nadu Generation
and Distribution Corporation Limited
Service with effect
from the date of assumption
of charge.
THIRUVALARGAL:-
1.
|
S.KALAISELVAN
|
2.
|
P.SUNDAR
|
3.
|
A.NAGARAJAN
|
4.
|
R.T.ARAVAZHI
|
5.
|
S.N.RAVEENDRAN
|
6.
|
D.NATARAJAN
|
7.
|
K.MURUGAN
|
2. The following postings of Executive
Engineers/Mechanical, are ordered:-
Sl.
No.
|
Name
and Designation
THIRUVALARGAL
|
Posted
on
Promotion
|
In
the place of
THIRUVALARGAL
|
(1)
|
(2)
|
(3)
|
(4)
|
1.
|
S.KALAISELVAN
EE/Mechanical
(Non-Independent)/
NCTPS
|
EE/Mech./Technical Services/NCTPS/
Chennai
|
Existing vacancy
|
..2..
..2..
Sl.
No.
|
Name
and Designation
THIRUVALARGAL
|
Posted
on
Promotion
|
In
the place of
THIRUVALARGAL
|
(1)
|
(2)
|
(3)
|
(4)
|
2.
|
P.SUNDAR
EE/Mechanical
(Non-Independent)/ETPS
|
EE/Mech./Coal/
Chennai
|
Existing vacancy
|
3.
|
A.NAGARAJAN
EE/Mechanical/
(Non-Independent)/
TTPS
|
EE/Mech./NCTPS
Stage-II (2X600MW)
|
Existing vacancy
|
4.
|
R.T.ARAVAZHI
EE/Mechanical/
(Non-Independent)/
MTPS
|
EE/Mech./Shift/TTPS
|
Existing vacancy
|
5.
|
S.N.RAVEENDRAN
EE/Mechanical
(Non-Independent)/
Gen.Circle/Kundah
|
EE/Mechanical/
Generation/Shift/
NCTPS
|
V.Venkatesawara Rao
EE/Mechanical
transferred
|
6.
|
D.NATARAJAN,
EE/Mechanical/
(Non-Independent)/MTPP Stage-III
|
EE/Mechanical,
O/oSE/VGTPS/
Phase-II/Ramnad
|
Existing vacancy
|
7.
|
K.MURUGAN,
EE/Mechanical/
(Non-Independent)/
MTPS
|
EE/Mechanical/Boiler Maintenance/ETPS
|
N.Sathiaseelan, EE/Mech. transferred
|
3. The Superintending Engineers concerned
are requested to relieve the officials under orders of promotion and postings immediately by making local
arrangements without waiting for substitutes and instruct them to join at the
new post before expiry of
joining time. A report should be sent
to the Tamil Nadu Generation and Distribution
Corporation Limited regarding the
date of relief
and date of
joining of the officials. This will be apart from the Certificate
of Transfer of Charge.
..3..
..3..
..3..
4.
An option format is enclosed herewith.
The officials mentioned in
para-1 above are requested to
return the option format
duly filled in,
within one month from
the date of promotion and assumption of charge. If the option format is not received
within the said period of one month, their pay in the
higher post will be fixed as specified in para-3 of Board's Memo.
No.75406/P1/90-1, dated 19.3.1991.
(BY
ORDER OF THE CHAIRMAN CUM MANAGING DIRECTOR)
A.S.PASUPATHI
SECRETARY
To
|
||||
Thiru D.NATARAJAN, Executive
Engineer/Mechanical(Non-Independent)/
MTPP/Stage-III
Through:- The Superintending
Engineer/Civil/MTPP Stage-III (1X600 MW)
|
Thiru K.MURUGAN, Executive Engineer/Mechanical/(Non-Independent)/MTPS
Through:- The Superintending
Engineer/P&A/MTPS
Copy to:-
The Director/Generation/TANGEDCO/Chennai
The Director
(Distribution)/TANGEDCO/Chennai
The Inspector General of
Police/Vigilance/Chennai
The Legal Adviser/TANGEDCO/Chennai,
The Managing Director/TANTRANSCO/Chennai
The Director/Projects/TANGEDCO/Chennai
..4..
..4..
..4..
The Director/Transmission
Projects/TANTRANSCO/Chennai
The Chief Engineers/TANGEDCO/TANTRANSCO
The Director/Finance/TANGEDCO/Chennai.
The Director/Finance/TANTRANSCO/Chennai.
The Director/Operation/TANTRANSCO/Chennai
The Chief Financial Controller/
TANGEDCO/TANTRANSCO/REVENUE/Chennai.
The Additional Chief Engineer/Chairman Cum
Managing Director’s Office.
The Superintending Engineer/P&A/NCTPS
The Superintending Engineer/P&A/ETPS
The Superintending Engineer/P&A/TTPS
The Superintending Engineer/P&A/MTPS
The Superintending
Engineer/Mechanical/Kundah
The Superintending Engineer/Civil/MTPP
Stage-III (1X600 MW)
The Superintending Engineer/Coal/Chennai
The Additional Chief Engineer/Valuthur
GTPS/Ramnad
The Director/Computer Centre,
The Chief Internal Audit Officer
The Deputy
Secretary/Personnel,
The Chief Public Relations Officer.
The Under Secretary/Services/Secretariat
Branch
The Under Secretary/General/Secretariat
Branch
The Private Secretary to Chairman Cum
Managing Director/Secretary.
Administrative Branch
Computer Centre
Vigilance Cell.
A2, A5, A15, A20, A22, A23 and A25
Sections/Secretariat Branch
::
TRUE COPY :: FORWARDED :: BY ORDER ::
SECTION OFFICER
No comments:
Post a Comment