T&P Estimates Models

 T&P Estimate (1).xlsx

View Download

Privatization of State Electicity Board (Guildelines issued by the Power Ministry Govt of India on 20.09.20 draft

 Priv atization of State Electricity Board.pdf

View Download

IPDS IT Enablement works in 521 Towns Modem and DCU Installation M/s.Analogics provision to made to obtain feeder breaker ON/OFF Status

 2. lr to all CEDist with annexure 17.09.2019.pdf

View Download

Remote Operation of Viyasarpadi 230 K.V.SS & Basin Bridge 230 K.V.SS Administrative Approval Orders

 Remote_Operation_Vyasarpadi_230KV SS_BP.pdf

View Download

85 Revenue Supervisor to ATO Suitability Called for

 RS to ATO -Suitability called for-Reminder Letter.docx

View Download

8 Assessment Officer to Senior Assessment Officer Suitability Called for

 ATO to Sr.ATO - Suitability called for -Reminder Letter.docx

View Download

TCL Working in need basis Rs.380/- per day in all Circles based on the approval committee List Called for

 Letter EXGRATIA.pdf

View Download

IMS Work Order Estimate Template Preparation Instruction Mannual

 IMS WO ESTIMATE TEMPLATE PREPARATION.pdf

View Download

Revenue Augmentation - Measures to be taken by the EDCs - to arrest the leakage and to maximize revenue Instructions & Format

 


View Download

Format for working Instruction (2).xlsx
View Download

Exemption from obtaining NOC to perform Jerusalem Pilgrimage through Govt Schemes G.O.Adoption in TANGEDCO Amendment

 BP NO 2214092020.pdf

View Download

Panel for promotion to the post of 2 Senior Draughtsman –names Selected – list Communicated

 DM-SDM.docx

View Download

JMD Review meeting Accounts wing with IT wing for the stores subjects Instructions

 Document 364.pdf

View Download

Re designation of EE/(Mech)/DRIP /Madurai as EE/Mech/Periyar Lower Camp orders Issued

 Re-designation of EE-Mechanical DRIP Madurai - Order copy.pdf

View Download

GIS Survey and Porting works - implementation action plan – Reg

 CE IT Lr to all CEs 18_09_20.pdf

View Download

Total Shutdown in SS may be taken once in 3 months DD Instructions dt. 09.2020

 


Review of work allocation in Thermal Station proposal of National Productivity Council for awarding the Technical consultancy work committee formation orders

 BP. No.23 dt.16.09.2020 NPC.pdf

View Download

வாரிசு வேலை வாய்ப்பு வழங்கும் போது தமிழ்வழி கல்வி உள்ளதா என ஆய்வு செய்திடக் கோருதல்

 MEMO tamil _2_.pdf

View Download

அனைத்து தொழிற் சங்க கூட்டமைப்பு சார்பாக மின்துறை அமைச்சரை சந்தித்து வழங்கிய கோரிக்கைகள் நாள்.14.09.2020

 file1_1600067869609.pdf

View Download

Tech Asst to JE II Gr (Mech) Panel (79) Allotment (35) Orders


View Download 


JE MECH II promo 11.09.2020.docx

View Download

Sub-Station Maintenance, Registers and other equipments Maintenance Instruction by CE/Madurai

 MDU Reg-SS Maintanance-Instructions 09.09.2020.pdf

View Download

Incentive Increments of Board Engineers wrong sanction avoidance of Instructions

 Memo.No.29295 dated 07.09.2020.pdf

View Download

Amendments of LT CT Services load 112 KW to 150 KW as per TNERC Orders

 LTCT 112 KW to 150 KW .pdf

View Download

Secretariat Branch appointment on Contract basis / Consolidated wages CPS to GPF Clarification

 Clarification - Regarding - Admission to GPF-CPS.pdf

View Download

Recovering the advance incentive increments court interim order of injunction

 WP(MD) No.8995 of2020 and etc., batch (12-08-2020) (2).pdf

View Download

34 Adm. Supr - Preparation of panel for promotion to the post of Asst. Adm. Officer Suitability Report Particulars called for

 AADO Suitability called for . 07-09-2020.pdf

View Download

E.T.P.S 130 RWE Staff Administrative Transfer allotted to CEDC/North Circle Reposting Orders

 ETPS 130 NOS TRANSFER ORDER.pdf

View Download

Agriculture applications registered manually - Effective use of Application tracking module in LT Billing Software- Reg.

 6.9.20 Agri_LT_Billing_software__entry-Cir. Memo..pdf

View Download

Office Procedures "Tottenham System" Procedures to be followed with regard to submission of files Implementation in all the offices of TANTRANSCO Orders

 Memo.Per. No. 31067-03.09.2020.pdf

View Download

Effective Management of court cases to safeguard to interests of TANGEDCO Instructions Report called for Nodal Officers

 List of Head of Department and Nodal Officer - Details - Called for.pdf

View Download

Preparation of panel of A.O. fit for promotion as Deputy Financial Controllers for the year 2019-20 – B.Com., Degree certificates called for

 AO to DFC B.Com certificate called for..pdf

தமிழ்நாடு மின் குறைதீர்பாளர்களின் தீர்வுகள் ( Ombudsman ) SL.N 21 and 41/2020

 தமிழ் எழுத்துக்களை கைபேசியில் காணஇயலாது கணனியில் பாா்கவும்.


Download Tamil Font


Sr. No

Petition No.

Appeal By

Details of Case

Order Date

 Uploaded

 on

41

02 of 2020

ÂU.A g‹Ü®bršt«,br‹id

nkšKiwp£lhs® j‹Dila Å£o‰F TLjš r¥Û£l® k‰W« jd¡F V‰g£l ÏH¥ò bjhif %.7.5 y£r« gzK« tH§f nt©o é©z¥Ã¤JŸsh®.

05-08-2020

10-08-2020

40

01 of 2020

ÂU.G. bt§fnlZ,Á‹dnry« t£l«.

ÂU.G. bt§fnlZ, 233, L.F.nuhL, f¢Áuha¥ghisa« - 606 207, Á‹dnry« t£l« mt®fë‹ 30.12.2019 ehë£l kD nkšKiwp£L kD v©.01/2020 Mf gÂÎ brOEa¥g£LŸsJ. nk‰f©l kDé‹ ÛJ ä‹FiwÔ®¥ghsç‹ nf£òiu 05-03-2020 m‹W eilbg‰wJ.

05-08-2020

10-08-2020

39

04 of 2020

M/s. Mir ò£ òuhl¡£, f%® kht£l«.

nkšKiwp£lhs® j‹Dila Mir ò£ òuhl¡£° ãWtd¤Â‰F brhªjkhd ä‹ Ïiz¥ò v©. 007-011-2574-š ä‹ msé gGjilªj khj§fS¡F jâ¡if Jiwædhš é¡f¥g£l ruhrç bjhifahd %. 56774/-I jŸSgo brŒÍkhW  ä‹FiwÔ®¥ghs® K‹ghf nkšKiwpL brŒJŸsh®.

30-07-2020

30-07-2020

38

70 of 2019

M/s. Annapoorani Cold Storage Pvt. Ltd,Chennai

The Appellant prayed to cancel the audit slip no.86, dated 04.04.2019 & withdraw the short fall amount demanded and to restore the tariff into III-B, industrial.

29-07-2020

30-07-2020

35

73/ 2019

ÂUkÂ. K. ru°tÂ, br‹id

nkšKiwp£lhsç‹ gHik thŒªj Å£il cil¤J mnj Ïl¤Âš f£oa òÂa Å£o‰F kW ä‹ Ïiz¥ò tH§FkhW é©z¥Ã¤JŸsh®.

24-07-2020

27-07-2020

36

71 of 2019

M/s. Blue Star Ltd., Chennai

The Appellant has prayed to refund the available deposits in dismantled LTCT Service Connection 133-004-484 with interest.

24-07-2020

27-07-2020

37

66 of 2019

Tmty. R.M. Meenatchi, Sivagangai Dist

The Appellant has prayed to set right excess bill charged during 01/2019 assessment in respect of service connection No. 06-187-017-1709.

24-07-2020

27-07-2020

34

78 of 2019

ÂU.S. nkhf‹jh°, éG¥òu« kht£l«.

nkšKiwp£lhsç‹ r®nt v© 392/7 é.kh¤öçš cŸs ngh® »z‰W¡F étrha ä‹ Ïiz¥ò tH§FkhW é©z¥Ã¤JŸsh®.

21-07-2020

21-07-2020

33

77 of 2019

Tmty. Mullai Balakrishnan, Virudhunagar

The Appellant has prayed to award compensation for the delay in shifting LT/HT lines as per TNE DSOP regulations.

21-07-2020

21-07-2020

32

64 / 2019

ÂU.br. m¥JšyhA, ÂUbešntè

ä‹ Ïiz¥ò v©. 07-004-004-331 nghè Mtz§fŸ rk®¥Ã¤J bg‰wjhfΫ, nk‰go ä‹Ïiz¥ig J©o¡f nt©oÍ« é©z¥Ã¤JŸsh®.

21-07-2020

21-07-2020

31

75 / 2019

ÂU.AK¤ija‹, fŸs¡F¿¢Á kht£l«

nkšKiwp£lhsç‹ r®nt v© 32/10-š cŸs MœJis »z‰W¡F étrha ä‹ Ïiz¥ò tH§FkhW é©z¥Ã¤JŸsh®.

16-07-2020

16-07-2020

30

68 of 2019

ÂU. S.g¤kehg‹, br‹id

nkšKiwp£lhs® jdJ ä‹ Ïiz¥òfŸ 433-002-522, 433-002-127 Ïu©L¡F« mÂfg£r f£lz« nghf Û gz¤ij %.12,994/-I  jd¡F ÂU«g ju nt©L« v‹W nf£L¡ bfh©LŸsh®.

16-07-2020

16-07-2020

29

63 of 2019

Dr.A. kça ik¡nfš, ÂUbešntè kht£l«.

nkšKiwp£lhs® jªij ÂU.mªnjhâK¤J ehlh® bgaçš tH§f¥g£l ä‹ Ïiz¥ò v©. 069-003-83 Åj¥g£o IV -# ÁW,FW étrha/Foir ä‹ Ïiz¥òfŸ bga® kh‰w« brŒa¥gl nt©L« v‹w murh§f £l¤Â‹ mo¥gilæš nkšKiwp£lhs® bgaçš bga® kh‰w« brŒa¥g£LŸsJ.

16-07-2020

16-07-2020

28

69 of 2019

Thiru D. Sakthivel,Chennai

The Appellant has prayed to drop the audit shortfall amount Rs.4,59,360/- for his service connection No. 319-007-118 for the meter defective period from 07/15 to 09/16

09-07-2020

14-07-2020

27

62 of 2019

M/s. Navins Spring Field Owners Association,Chennai

The Appellant prayed to set aside the order passed by GGRF/CEDC/South2 on misconception ofRegulations, and to adjudicate the issue on merits and to direct the authorities concerned to revise the bill paid under protest on the threat of disconnection of other services consequent to the filing of CGRF and to apportion in the manner of bimonthly billing and refund the excess amount paid as disconnection of service connection was not done but entry was made in the system.

09-07-2020

14-07-2020

26

67 of 2019

ÂU.m.nuQ fΩl®,

nkšKiwp£lhs® jdJ Å£o‰F òÂa ä‹ Ïiz¥ò ju nt©o é©z¥Ã¤JŸsh®.

03-07-2020

14-07-2020

25

65  of 2019

ÂU.MÂ.btŸisa¤njt‹, òJ¡nfh£il kht£l«

nkšKiwp£lhsç‹ g£lh ãy¤Âš jdJ r«kj« bgwhkš el¥g£l ä‹ f«g¤ij mf‰¿  kh‰W tê¥ghijæš mik¤J rçbrŒÍkhW nt©oÍŸsh®.

03-07-2020

14-07-2020

24

61  of 2019

ÂU. V.K. uhn#ªÂu‹,f%®

nkšKiwp£lhsU¡F brhªjkhd ä‹ Ïiz¥ò v©. 002-101-230, TF-V, 7/2010 Kjš 05/2013 tiu cŸs fhy¤Â‰F éLg£l bjhif %.46,615/- I thça éÂKiw¥go éLg£l fhy¤Â‰F Kªija mjhtJ 7/2010 khj¤Â‰F K‹ò cŸs ä‹ gaÜ£L msÎ ôå£il it¤J ruhrç fz¡ÑL brŒJ Ûj bjhifia tNš brŒa Mtz brŒÍkhW Ef®nth® k‹w¤ij ehoÍŸsh®.

03-07-2020

14-07-2020

23

59 of 2019

M/s. V.S. Hotel (Hotel Grand Palace),  Chennai

The Appellant has prayed to set aside the order dated 24.09.2019 passed by the CGRF, CEDC/South-II in the CGRF petition No.120/2019.

03-07-2020

14-07-2020

22

58 of 2019

ÂU.K.brªÂšFkh®, br‹id

nkšKiwp£lhs® jdJ Å£o‰F TLjyhf eh‹F xUKid ä‹ Ïiz¥ò nt©o é©z¥Ã¤j é©z¥g§fë‹ ÛJ elto¡if vL¡fhjJ F¿¤J cça ÏH¥ÕL tH§f nt©oÍŸsh®.

03-07-2020

14-07-2020

21

49 of 2019

Dr. S. Prakash, Principal, Coimbatore

The Appellant hasrequested to quash the CGRF order and to set aside the excess demand charges levied towards alleged excess consumption of over and above the sanctioned demand of 112 KW and to refund the amount Rs.13,11,494/- illegally collected from the consumer.

03-07-2020

14-07-2020